Laserfiche WebLink
Colorado Division of Minerals and Geology <br />ESTIMATING FORM - YHEEL LOADER IgRK <br />Task !1: 1 Prep. by: RCO Tesk filemm~e M210-1 <br />Date 09/30/94 Permit N:M-77-210 Mine: Snyder quarry <br />Permitting action Fi nel reclamation - Yest Ridge <br />Task description Backfill limestone caste - 5.7 arras <br />Hg1RLY EOUI PNENT COST <br />Basic machine: GT 966E <br />Attachment p1: ROPS Cab <br />Sheet 1 of 2 <br />Horsepower = 216 <br />Shift baeis:l/day <br />cool bSli) <br />Cost Breakdown - Ownership = f31.38 <br />------------- - Operating-loader = 522.97 100 X utilization <br />- Operator = 521.58 <br />- Total cost/hr = f75.93 Total fleet cost/hr = (75.93 <br />MATERIAL QUANTITIES <br />Initial Swell final <br />volume = 15,000.0 LCY factor = M/A volume = 15,000.0 LCY <br />quantity source/reference Amendment application <br />X Swell source/reference Program <br />NOURLY PRODUCTION <br />Loader Cycle Time <br />Unadjusted Basic Cycle Time (load, dung 8 maneuver) = 0.525 min. <br /> (CHB li$A) <br />Cycle Time Factors: Factor (min.) <br />Meteriel• Mixed material 0.020 (CXB ibA) <br />Pile- Conveyor or dozer piled 10 ft. high 8 0.000 (CHB I8F) <br />Truck Ownership- No adjustment - factor not applicable 0.000 (CXB 16A) <br />Operation- Constant operation •0.040 (CHB lbiS) <br />Target- Nominal target <br />------------------ 0.000 (CHB 16A) <br /> Net Cycle Time Adj.= -0.020 min. <br /> Adj. Basic Cycle Time = 0.505 min. <br />l <br />