Laserfiche WebLink
LJ: S. DEPT. OF THE ~TERIOR <br />OFFICE OF SURFACE MINING <br />Mine Site Evaluation State Program <br />Permittee/ COLORADO PAMPA COAL Permtt C-071-81 Field Visit 07/19/2000 Continuation Page <br />Person Number Date <br />28. <br />Codes: 1=Compliance, 2=Noncompliance, 3=Not <br />A. Administrative <br />1. _ Mining within Valid Permit <br />2. _ Mining within Bonded Area <br />3. ~ Terms & Conditions of Permit <br />4. _ Liability Insurance <br />5. _ Ownership and Conuol <br />6. _ Temporary Cessation <br />7. _ AML Rec. Fees -- Non-Respondent <br />8. _ AML Rec. Fees -- Failure to Pay <br />B. Hydrologic Balance <br />1. 1 Drainage Control <br />2. 1 Inspections & Certifications <br />3. 1 Siltation Structures <br />4.~ Discharge Structures <br />5.~ Divetions <br />6. 1 Effluent Limits <br />7. 1 Ground Wa[erMonitoring <br />8.1 Surface Water Monitoring <br />9. 1 Drainage -- Acid-Toxic Materials <br />10.1 Impoundments <br />I l._ Stream Buffer Zones <br />C. Topsoil & Subsoil <br />L 1 Removal <br />2. 1 Substitute Materials <br />3. 1 Storage and Protection <br />D. <br />Backfilling & Grading <br />1. 1 Exposed Openings <br />2. 1 Contemporaneous Reclamation <br />3.~ Approximate Original Contour <br />4.~, Highwall Elimination <br />5.~ Steep Slopes (includes downslope) <br />6. 1 Handling of Acid & Toxic Materials <br />7. 1 Stabilization (rills and gullies) <br />Excess Spoil Disposal <br />I._ Placement <br />2._ Drainage Conuol <br />3._ Surface Stabilization <br />4._ Inspections & Certifications <br />Coal Mine Waste <br />(Refuse Piles/Impoundments) <br />l._ Drainage Control <br />2._ Surface Stabilization <br />3._ Placement <br />4._ Inspections and Certifications <br />5._ Impounding Swctures <br />Use Of Explosives <br />1. Blaster Certification <br />2. Distance Prohibitions <br />3._ Blast Survey/Schedule - <br />4._Warnings & Records <br />5. Control of Adverse Effects - <br />E. <br />F. <br />G. <br /> Performance Standard Catagories <br /> 30 CFR Counterpart <br />A. Admittistrotive ......................................................................... <br />I. Valid Pcnnit ......................................................................... ...........773.11 <br />2. Mining within Bonded Area ...................................... ..........773.1 I <br />3 . Terms & Conditions of Permit ................................... ..........773.17 <br />4. Liability Insutonce ...................................................... ..........800.60 <br />5. Ownership and Conuol .............................................. ..........778.13 <br />6 <br />7 . TempoLary Cessation ..............................842.11(e) & <br />. AML Rec. Fces --Non-Respondan[ ........................... 816/817.131 <br />.....870.15(b) <br />8 . AML Rec. Fees -Failure to Pay ............................... ......870.I5(a) <br />E. Excess Spoil Disposal ...........................................(816817.71-74) <br />1. Placement ................................................................ ...........................71(e) <br />2. Drainage Conuol .................................................... ............................71(0 <br />3. Surface Stabilization ............................................... ............................71(8) <br />4. Inspections &Certifications ................................... ............................71(h) <br />F. Coal Mine Waste (Refuse Piles/Impoundments) ,,,,,(g16817.81-84) <br />1. Drainage Control ................................................... ............................83(a) <br />2. Surface Stabilization ............................................... ...........................83(b) <br />3. Placement ................................................................ ...........................83(c) <br />4. lnspecrions and Certifications ................................. ..........................83(d) <br />5. Impoundine Stmcmres ............................................ ...............................84 <br />B. Hydrologic Balance ......................................(816/817.41-57) G. <br />I. Drainage Conuol ....................................... ..................................45 <br />2. Inspections &Certifications ..................... ........................49(a)(10) <br />3. Siltation Stmctures .................................... ..................................46 <br />4. Discharge Structures ................................ ...................................47 <br />5. Diversions ................................................. ..................................43 <br />6. Effluent Limits .......................................... ..................................42 <br />7. Ground Water Monitoring ........................ ..............................41(c) <br />8. Surface Water Monitoring ........................ ..............................41(e) <br />9. Drainage--Acid-Toxic Matedals ............. ..............................41(0 <br />10. Impoundments .......................................... ..................................49 <br />11. Stream Buffer Zones ................................ ...................................57 <br />C. Topsoil &Subsoil ................................. ..............(816/817.22) <br />1. Removal .................................................... ..............................22(a) <br />2. Substitute Materials .................................. ...............................22(c) <br />3. Storage and Protection .............................. ...............................22(c) <br />4. Redistribution ............................................ ..............................22(d) <br />D. Backfilling & Grading ..............................(816/817.95-107) <br />1. Exposed Openings .....................816/817.1 3, 14, 16, & 823.1 I & 21 <br />2. Contemporaneous Rulamation ................. .................................100 <br />3. Approximate OriginalContour .................. ........................102(a)(I) <br />4. Highwall Elimination ................................. ........................102(a)(2) <br />5. Steep Slopes (includes downslope) ............ ................................107 <br />6. Handling of Acid & Tonic Materials ......... .............................102(c) <br />7. Stabilization (rills and gullies) ................... ...............................95(b) <br />1. <br />2. <br />3. <br />4. <br />5. <br />H. <br />I. <br />1. <br />2 <br />3. <br />4. <br />S. <br />IG <br />L. <br />M. <br />Use of Explosives ..................................................(816817.61-68) <br />Blaster Certification ......................................... ..................................61(x) <br />Distance Prohibitions ....................................... ..................................61(d) <br />Blast Survey/Schedule ...................................... .................................62-64 <br />Warnings & Records ....................................... ...............................66 & 68 <br />Conuol of Adverse Effects .............................. .......................................67 <br />Subsidence Control Plan .........................................(817.121.122) <br />Roads ........................................................ .........(816817.150-151) <br />Road Conswction ............................................ ...............................I50(c) <br />Certification ...................................................... ................................1 S 1(a) <br />Drainage ........................................................... .................... I50(b)- I S 1(d) <br />Surfacing and Maintenance .............................. ....................I50(e)-151(4) <br />Reclamation ..................................................... .................................150(0 <br />Signs & Markers .................................... ...................(816817.11) <br />Signs ................................................................ .....................1 l (a).(b),&(c) <br />Markers ............................................................ .......... l I (a).(b).(d),(e).&(0 <br />Distance Prohibitions ............................. ..........................(761.11) <br />Revegetation ........................................... .......... (81 N817.111.11~ <br />Vegetative Cover ............................................. ..........................Ill & 116 <br />Timing ............................................................. ..................................... l I3 <br />Postminiog Land Use .............................................(816/817.133) <br />Page 2 of <br />Elsewhere, 6=Previously Cited <br />H. _Subsidence Control Plan <br />I. Roads <br />1. 1 Road Conswction <br />2. 1 Certification <br />3. I Drainage <br />4. 1 Surfacing and Maintenance <br />5. 1 Reclamation <br />J• Signs & Markets <br />1. 1 Signs <br />2.~ Markers <br />IC. 1 Distance Prohibitions <br />L. Revegetation <br />I. 1 Vegetative Cover <br />2. 1 Timing <br />M. 1 Postmining Land Use <br />N. Other <br />General <br />Performance <br />Catagory <br />2 1) phase II a III H. A. Insp. <br />