My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2004-11-02_REVISION - M1987028
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1987028
>
2004-11-02_REVISION - M1987028
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 11:41:38 AM
Creation date
11/21/2007 9:22:27 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1987028
IBM Index Class Name
Revision
Doc Date
11/2/2004
Doc Name
FW Increase
From
DMG
To
Colorado Marble LLC
Type & Sequence
SI1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Truck/Loader Team Work cont'd Task # : 008 sheet 2 of 2 <br />Loading Tool Cvele Time : Number of loading tool passes required to fill Wck : 4 passes <br />Excavators and front shovels -machine cyde time vs. job condition rating : NA <br />-selected value within basic rating : NA <br />Track loaders - material descr.: NA <br />-cyde time elements (min.) : Load : NA Maneuver : NA Dump : 0.100 <br />Wneel and track loaders -unadjusted basic loader cyde time (load, maneuver, and dumf 0.475 minutes <br />Cyde Time factors Loading Condition Description Factor (min.} Source <br />Material : Mixed material 0.020 (Cef HBj <br />Stockpile: ConveyorordozerpiledfOR.highandup 0.000 (CatHBJ <br />Truck ownership : Common ownership of trucks and loaders -0.040 (Cat HBj <br />Operation : Constant operation -0.040 (Cat HBj <br />Dump target . Nominal target 0.000 (Cat HBj <br /> Net cyde time adjustment : -0.060 minutes <br /> Adjusted loader cyde 8me (total time per loader pass) : 0.415 minutes <br /> Net load time per Wck' : 1.345 minutes <br />Track CVCIe Time : ' Gulk of tst loader cyde completed during Uu& exchange N adj. loatler rytle time <exchange time <br />Truck exchange 8me ": 0.50 minutes........ Adjusted for site al8tude : 0.562 minutes <br />Truck load time: 1.345 minutes........ Adjusted for site altitude : 1.546 minutes <br />Truck maneuver and dump time: 0.80 minutes........ Adjusted for site altitude : 0.899 minutes <br />"sat at o if exchange lima <ad7. loader Cyda gm0 (VUCk exchange completetl during tst loader cyde) <br />Truck Vavel (haul & return) time: Road condition :Ruffed diR, 8[tle maintenance, no water, 2"fire penetration <br />Haul route <br />Roatl <br />ae9mentp Haul distance <br />(feet) Grade <br />res. (%) Rolling <br />res. (%) Total <br />resistance (°k) Speed <br />(feet/minute) Travel time' <br />(minutes} <br />1 700 500 5.00 10.00 1068 0.879 <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />Return ro ute : Haul 8me'" : 0.763 <br />1 700 -5.00 5.00 0.00 2938 0.277 <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />ntnutes <br />• (ravel time shovm for each segment indudes accelemtioNdecetere4'on adjusbnent Return 8me": 0.391 minutes <br />°loWl haul and return Ilrtie sho.m lodutlas altitude atljustmenl Total Wdc cycle 8me : 4.082 minutes <br />loading tool unit production : 169.37 LCYlttour...... Adjusted for job efldency : 140.58 LCY/hour <br />Truck unit production : 87.47 LCYltlour...... Adjusted for job efficiency : 72.60 LCY/hour <br />OpBmal no. trucksAoading tool : 2 trucks........... Selected no. Wcks/loader : 2 trucks <br /> Adjusted houdy truck team produc8on : 145. f9 LCYfir <br /> Adjusted houdy single tmckk/loader team production : 140.58 LCY/hr <br /> Adjusted houdy mul8ple WGdloader team produc8on : 140.58 LCYRtr <br />JOB TIME AND COST <br />Fleet size : 1 Team(s) Total job 8me : 37.70 Hours <br />Unit cost : $1.804 /LCY Total job cost : j9,560 <br />
The URL can be used to link to this page
Your browser does not support the video tag.