My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2004-11-02_REVISION - M1987028
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1987028
>
2004-11-02_REVISION - M1987028
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 11:41:38 AM
Creation date
11/21/2007 9:22:27 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1987028
IBM Index Class Name
Revision
Doc Date
11/2/2004
Doc Name
FW Increase
From
DMG
To
Colorado Marble LLC
Type & Sequence
SI1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
sheet 1 of 2 <br />CIRCES Cost Estimating Software <br />TRUCK/LOADERTEAM WORK <br />Agency or organiza8on name :DMG <br />Task # : 008 State : Coloredo PermiUob # : M-1987-028 <br />Date : 11/01/2004 County :Chaffee Abbreviation :none <br />User : ESC Site :Lily Mines Filename : M028-008 <br />Permit or other job action :Surety Increase <br />Task descdp8on :Clean & Grade Taylor Gulch Drainage <br />HOURLY EQUIPMENT COST Shift basis : 1 per day <br />area <br />Road maintenance -Motor grader <br />-Water Wck <br />Cost Breakdown : Truck/LOad <br />Truck er Work Team <br />Loading Tool Support Equipment <br />Load Area Dump Area Road Maintenance Equipment <br />Motor Grader Water Truck <br />Import tlata filename : truck2 loader NA Borer NA NA <br />Utilization-machine : 97 100 NA 50 NA NA <br />-Ripper attachment: NA NA NA NA NA NA <br />Ownership cosUhour: $10.73 $8.66 NA $42.78 NA NA <br />Operafing cesUhour: $13.30 $13.89 NA $33.04 NA NA <br />Ripper op.cosUhour: NA NA NA $0.00 NA NA <br />Operator cosf/hour: $21.80 $31.76 NA $31.76 NA NA <br />Unit subtotals: $45.84 $54.31 NA $107.59 NA NA <br />Number of units : 2 1 0 1 0 0 <br />Group subtotals : Work : $145.99 Support : $107.59 Maintenance : $0.00 <br />Total work team wst/hour <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />volume : 5,300 LCY factor : NA volume : 5,300 LCY <br />Source of quantity takeoff :DMG Estimate <br />Source of estimated swell factor :DMG Estimate <br />Material purchase cost : $0.00 /LCV Total cost : $0 <br />HOURLY PRODUCTION <br />Truck Canaci <br />Truck Payload (weight) Basis : Truck Bed (volume) Basis : <br />Material weight : 2,900 pounds/LCY Stack volume : 7.00 LCY <br />Descr.: Decomposed mck - 50% rock, 50% earth Heaped volume : 8.00 LCY <br />Ratetl payload : 20,300 pounds Average volume : 7.50 LCY <br />Payload capacity : 700 LCY Adjusted volume': 7,00 LCY <br /> Final truck volume based on number of loader passes : 5.95 LCY <br /> 'Wck volume atljusted !o not exceeA r`!ed paNoao or heapetl volume <br />Loading Tool Cagaciri <br />Rated rapacity (nom. heaped) : 1.700 <br />Descr.: Loose material - 1"and over (85 <br />LCY I I Truck <br />Site al8tutle (ft.) : 11,000 <br />Loader Source <br />0.870 (Cat HB <br />Bucket fill factor : 0.875 Job efficiency : 0.830 i 0.830 <br />Adjusted bucket capacity : 1.488 LCY Net cortection : 0.739 0.722 <br />
The URL can be used to link to this page
Your browser does not support the video tag.