Laserfiche WebLink
B. Primary alterations in the original permit <br />I. Reclamation area in Area I was delayed and would <br />become part of the backfill slope extending southward from <br />• the back of the Castle Concrete Sand Pit. <br />a) Backfilling that had been completed would remain <br />but would be reutilized as a transportation route <br />between the two pits. <br />2. Mining of coarse gravels included in TR#I <br />were incorporated into the permit thereby <br />technically eliminating TR#1. <br />3. Timetables of mining east of Academy Boulevard <br />were altered drastically calling for more open mining in <br />more areas rather than a purely sequential process. <br />4. Final topography east of Academy Boulevard was altered and <br />expanded to fit the additional mining area. <br />5. Entire revegetation approach was altered to include <br />more modern species, a more rapid approach to <br />achieving vegetation cover, and greater adaptability to <br />possible future uses other than that designated. <br />C. In general, the amendment was a complete rewrite of <br />the original permit and TR#I (minor exhibits were generally <br />not altered). <br />• D. It is suggested that for more detailed information <br />on particular aspects of the amendment the amendment document <br />be carefully reviewed in conjunction with the adequacy letter <br />and the responses to the adequacy letter. <br />• <br />History <br />Page HIS-8 <br /> <br />