Laserfiche WebLink
<br />2) The designs for the postmining drainage channel on the <br />reclaimed bench need to be approved by the Division prior <br />to reclamation of the upland diversion currently in <br />place. It would be to Eastside's benefit to have the <br />designs approved prior to backfilling the area. <br />3) A reclamation bond which is adequate to cover the cost of <br />completion of the above tasks will need to be submitted <br />prior to issuance of the renewed mine permit. The two <br />tasks above could significantly affect the reclamation <br />cost estimate of the mine. <br />If you have any questions, feel free to call me or Larry Routten at <br />(303) 866-3567. <br />Sincerely, <br />Barbara L. Pavlik ' <br />Environmental Protection Specialist <br />cc: Larry P. Routten <br />