Laserfiche WebLink
_~ <br />htr. Springer - 4 - January 30, 1987 <br />C. Bear Coal Company is requested to submit the cost per pound for each <br />of the species in the approved seed mix for the Bear No. 3 mine. <br />The cost per pound for the seed mix is necessary for the adequate <br />calculation of the Bear No. 3 reclamation Bond. <br />11. The following sections of the Bear Coal Company application neeG to be <br />updated to reflect the current status of the mine per Rule 2.03.3(1): <br />A. S~etion 2.03.4: Revise page no. 2.03-12 to reflect the federal <br />agency which owns the coal. <br />B. Section 2.03.5: Update the list of previous violations to i;clude <br />all violations and their resolution to date. <br />C. Section 2.03.8: Updata the narrative in this section to reflect the <br />coal mini:;a activities in Faderal Coal Lease C-0117192. Thls <br />section needs to be revised to reflect the current mining situation <br />and mining plans for the next five years. <br />D. Section 2.05.3: i%arts o` this section should be updated to reflect <br />the cu~•rent mining situa`ion at Bear No. 3. Bear ?hould describe <br />its ~~iining activities over the past five years as well as its <br />,'ginned activities for the upcoming permit term. Undergroun; and <br />surface ac~ivities shoul~ be described. Panel numbers should be <br />used wher possible. The narrative should describe the location of <br />the underc-nund development waste disposal area and Bear s <br />development of and improvements to the Edwards Mine workings. <br />12. The following maps fcr the Bear Mining operation need tc be updated to <br />re fl ~?/'t hhu rii r)^a nr mi r~i !Ig g7 LUa ~'Cn dnd 'ndlCdt2 fUtU rc dC i. i'/i tic. <br />A. The aline Plan Map (Map 9) should be updated to indicate tha location <br />and dates of Bear's past, present and future mining activities. The <br />map should ',aclude panel numbers, location of the underground sump <br />and the location of the underground development waste disposal area. <br />B. Sear Coai Company needs to indicate the boundary between the <br />Riperian and Wet Mixed Shrub plant communities on the Vegetation Map <br />(Map 3). <br />C. The Mine Facilities Map (Map 10) should be updated to reflect <br />facilities currently at the mine site. The truck load-out facility <br />should be added to this map. <br />D. Bear Coal Company needs to change the Post-Mining Contour Map <br />(Map 12) to indicate the post-mining topography of the portal bench <br />area. The current map indicates that the bench will be completely <br />filled leaving no flat areas. The narrative in the reclamation plan <br />states that the portal face-up will be left intact in part and the <br />bench will only be partially backfilled. Map 12 needs to be changed <br />if the permit is to be consistent. Map 12 also needs to indicate <br />that the flood control berm will be retained. <br />