Laserfiche WebLink
CIRCES Coat Eatlmatlna Software <br />PROJECT IDENTIFICATION <br />Date : 2frSep-2007 Permit or job no. <br />User : ESC Abbrevla6on <br />Filename <br />Agency or organization name : DRMS <br />Permit or iob action :CN-01 <br />Itf-1997-085 <br />none <br />M065-000 <br />Site :Brownstone Quarry <br />State :Colorado <br />County : Ladmer <br />IASR LIiiI IUIKt(:1 GVPf l.`fl FORM FLEET TASK DIRECT <br />NO. TASK DESCRIPTION USED SIZE HOURS COST <br />001 -Structural Gematitian demolish 1 40. $25, 920 <br />002 -Haul Upper Overburden Pile Into Pit & Grade truckf 2 331.0 $207,468 <br />003 -Replace Overburden/Topsoll From Lower Piles dozer 2 61.4 $19,685 <br />004 -Rip Storege/Building Area ripper 1 4.7 $659 <br />005 -Revegetate Allected Areas revege 1 40.0 $33,218 <br />008 -Mobilizatiorr/Demobilizafion mobilize 1 9.7 $8,163 <br /> susrorALS: 486.9 $295,111 <br />• inGudes inflation factor ad uefinent of : NA <br />1 % TOTAL DIRECT COST • $295,111 <br />INDIRECT COSTS <br />OVERHEAD AND PROFIT - Llabilily In3UfanCe : 2.02 % of direct total = $5, 961 <br />Performance bond : 1.05 % of dhact total = $3,099 <br />Job superintentlertt : NA' NA NA total = NA <br />Profit : 10.00 % of direct total = $29,511 <br />• not required (or eqp. operator serves as super) TOTAL O 8 P = $36, 571 <br />LEGAL -ENGINEERING -PROJECT MANAGEMENT- CONTRAt'rAMOUNT (direct ~ O S P) _ $333,682 <br />Financial warcanty processing (IegaUrelated costs) : 500.00 total $ NA total = $500 <br />Engineedng work and/or contracUbid preparation : NA NA NA total = NA <br />Reclamation management and/or administration : 5.00 % of cntr. NA total = $18,884 <br />CONTINGENCY - NA' NA focal = NA <br />' conGbpencies accounted /or at task level TOTAL INDIRECT COST = $55, 733 <br /> TOTAL BOND AMOUNT (direct + Indirect) _ $350,888 <br />