<br />3. Response acceptable. <br />4. Response acceptable. <br />5. Response acceptable. <br />6. Response acceptable. <br />ADDITIONAL ADEQUACY COMMENTS <br /> <br />1. The calculation discrepancies that you noted in the demolition table were not errors. The <br />reason that the figures in the adjusted total cost column do not reflect the product of the <br />quantity column figures multiplied by the base unit cost figures is because the total cost figure <br />is adjusted by the location adjustment percentage shown at the top of the table. <br />2. The ripping cost for the roads was put in the bond calculation because your reclamation table <br />shows that 4.27 acres of roads require reclamation. After our conversation, it is noted that <br />the roads are in the table but are not to be reclaimed. I have recalculated the bond with the <br />ripping costs removed, and enclosed the revised summary form. Please replace the previous <br />summary form with the enclosed summary form, and remove the worksheet for task no. 04a. <br />The grand total cost figure on the top of the first page of the summary form is the financial <br />warranty amount that will be required upon approval of this amendment application. <br />If you need additional information, please contact me at the Division of Minerals and Geology, <br />Durango Field Office, 484 Turner Drive, Building F, Suite 101, Durango, CO 81301, phone no. <br />970-247-5062. <br />Sincerely, <br />~~~~' ~- <br />Steve S. Shuey <br />Environmental Protection Specialist <br />enclosure <br />cc: Edward M. Gardner - Whitewater Building Materials Corp. w/encl. <br />