My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REV04567
DRMS
>
Back File Migration
>
Revision
>
REV04567
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 1:02:44 AM
Creation date
11/21/2007 9:18:43 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1980002
IBM Index Class Name
Revision
Doc Name
CHRONOLOGY OF CORRESPONDENCE OC MINE C-80-002
Type & Sequence
RN2
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br />January 12, (Replaced pages in Permit Application) Page 3 of the Permit Application <br />submitted by the mine -This page lists the permitted, actual and proposed permitted acreage <br />as 80 acres. <br />April 2, (Findings Document File) Findings Document, Description of the Mining and <br />Reclamation Plan, page S -This portion of the Findings stated the following. <br />For this permit term the operator is mirung 80 acres. The operator has recently been <br />granted a lease modification to add an additional 120 acres to the existing Federal <br />lease. This lease modification will require a revision of the mine plan which has not <br />been developed nor proposed as a part of this permit renewal. The current mine plan <br />calls for reclamation to begin in approximately 1993, following the completion of <br />mining. <br />And page 15 of the Findings stated the following. <br />The Division has been concerned that current permit boundaries showed that the <br />applicant would be mining off the present Federal lease boundary into a Federal <br />lease block outside the permit boundary. The mine as reviewed by the Division for <br />the upcoming five-year term includes mining only in the lease block contained within <br />the present 80-acre permit area. The application submitted for renewal of the current <br />permit does not include approval for mining within a 120- acre lease modification <br />recently granted. Mining as currently proposed should terminate in the year 1993. <br />Reclamation will commence immediately upon completion of mining. <br />Undated <br />(Exhibit 1, Current Permit Application) Surface Ownership Map -Labels Sl/2 of NEI/4 of <br />sec. 16 (80 acres) as "Present Permit Boundary". Labels N1/2 of NEl/4 of sec. 16 and <br />NWl/4 of the NWl/4 of sec. 15 (120 acres) as "Future Permit Boundary". <br />(Exhibit 1, Current Permit Application) Subsurface Ownership Map - Labels Sl/2 of <br />NEl/4 of sec. 16 (80 acres) as "Present Permit Boundary". Labels Nl/2 of NEl/4 of sec. <br />16 and NWl/4 of the NWl/4 of sec. 15 (120 acres) as "Future Permit Boundary". <br />4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.