My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2006-05-19_REVISION - M2001088
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M2001088
>
2006-05-19_REVISION - M2001088
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 6:05:56 PM
Creation date
11/21/2007 9:17:33 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2001088
IBM Index Class Name
Revision
Doc Date
5/19/2006
Doc Name
Response to Preliminary Adequacy Review
From
Map Surveys Inc
To
DMG
Type & Sequence
CN1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
35
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Phase 10 Mining (2010) <br />Unit 1 Gravel processing and storage area. Remove equipment when gravel is <br />depleted. <br />Unit 2 Gravel processing and storage area and storm water detention area. <br />Unit 3 <br />thru <br />Unit 7 Totally reclaimed except for access roads. <br />Unit 8 Distribute topsoil from Unit 10. <br />Fall -Start re-vegetation. Idle except for access road to mining, processing and <br />stockpile areas. <br />Unit 9 Gravel extraction. Distribute topsoil from Unit 10 berms. Start re-vegetation. <br />Unit 10 Distribute topsoil to Unit 9. <br />Unit 11 Unaffected -topsoil storage for reclamation of Unit 1. <br />Unit 12 Unaffected -overburden storage for reshaping Unit1. <br />Phase 11 Reclamation (2011) <br />Unit 1 Reshape with overburden from Unit 12 and distribute topsoil from Unit 11. <br />Unit 2 Prepare for re-vegetate in the Fall.. <br />Unit 3 Re-vegetate access road to mining, processing and stockpile areas. <br />thru <br />Unit 12 <br />~ Apply for release if vegetation is firmly established. ~ <br />-5- <br />
The URL can be used to link to this page
Your browser does not support the video tag.