Laserfiche WebLink
Phase 10 Mining (2010) <br />Unit 1 Gravel processing and storage area. Remove equipment when gravel is <br />depleted. <br />Unit 2 Gravel processing and storage area and storm water detention area. <br />Unit 3 <br />thru <br />Unit 7 Totally reclaimed except for access roads. <br />Unit 8 Distribute topsoil from Unit 10. <br />Fall -Start re-vegetation. Idle except for access road to mining, processing and <br />stockpile areas. <br />Unit 9 Gravel extraction. Distribute topsoil from Unit 10 berms. Start re-vegetation. <br />Unit 10 Distribute topsoil to Unit 9. <br />Unit 11 Unaffected -topsoil storage for reclamation of Unit 1. <br />Unit 12 Unaffected -overburden storage for reshaping Unit1. <br />Phase 11 Reclamation (2011) <br />Unit 1 Reshape with overburden from Unit 12 and distribute topsoil from Unit 11. <br />Unit 2 Prepare for re-vegetate in the Fall.. <br />Unit 3 Re-vegetate access road to mining, processing and stockpile areas. <br />thru <br />Unit 12 <br />~ Apply for release if vegetation is firmly established. ~ <br />-5- <br />