Laserfiche WebLink
Phase 8 Mining (2008) <br />Unit 1 Gravel processing and stockpile areas. <br />Unit 2 Gravel processing and stockpile areas and storm water detention area. <br />Unit 3 <br />th ru <br />Unit 5 Re-vegetated except for road access to mining, processing and stockpile areas. <br />Unit 6 Distribute topsoil from Unit 8. Re-vegetation of topsoil from Unit 8. <br />Unit 7 Gravel extraction. Reshape mined out areas with overburden from Unit 8. <br />Unit 8 Gravel extraction. <br />Distribute topsoil to reshaped areas in Unit 8. <br />Unit 9 Unaffected. <br />Unit 10 Re-vegetating for use on Unit 9. <br />Unit 11 Remove remaining overburden to reshape Unit 7. <br />Unit 12 Overburden storage for reshaping Unit 1. <br />Phase 9 Mining (2009) <br />Unit 1 Gravel processing and stockpile area. <br />Unit 2 Gravel processing and storm water detention area. <br />Unit 3 <br />thru <br />Unit 6 Re-vegetated except for access road to Unit 8 8 9. <br />Unit 7 Distribute topsoil from Unit 9. <br />FaII 2009: Re-vegetate except for access road to processing & stockpile area. <br />Unit 8 Gravel extraction. Distribute overburden from Unit 9. <br />Unit 9 Gravel extraction. Distribute topsoil to resha~~ed Unit 7 & overburden to Unit 8. <br />Unit 10 Unaffected -Topsoil storage for Unit 9. <br />Unit 11 Re-vegetated except for topsoil berms along 35 Road for reclamation of Unit 1. <br />Unit 12 Unaffected -Overburden storage for Unit 1 mshaping. <br />-4- <br />