Laserfiche WebLink
Phase 4 Mining (2004) <br />Unit 1 Gravel processing and storage. <br />Unit 2 Gravel processing and storage and storm water detention area. <br />Unit 3 Shaping with overburden from Unit 4. <br />Unit 4 Remove topsoil & overburden to reshape Unit 3 & storage on Units 11 & 12. <br /> Gravel extraction. <br />Unit 5 Distribute topsoil from Unit 5 on reshaped areas of Unit 3. <br /> Fall 2004 -Start re-vegetation of slopes on Unit 3. <br />Unit6 Unaffected. <br />thru <br />Unit 10 <br />Phase 5 Mining (2005) <br />Unit 1 Gravel processing & storage. <br />Unit 2 Gravel processing 8 storage and storm water detention area. <br />Unit 3 Re-vegetating except for road access to mining, processing and stockpile areas. <br />Unit 4 Gravel extraction. Re-shape mined out areas with overburden from Unit 5. <br />Unit 5 Remove overburden to mined out Unit 4. <br />Gravel extraction by dozer to Unit 4. <br />Unit 6 Remove topsoil from Unit 6 to stockpile on Unit 10. <br />Unit 7 <br />thru <br />Unit 9 Unaffected except for access from Unit 6 to Unit 10. <br />Unit 10 Topsoil stockpile area. <br />Unit 11 Overburden stockpile area. <br />Unit 12 Overburden stockpile area. <br />-2- <br />