Laserfiche WebLink
reclamation bond currently being recalculated. <br />Demolition of concrete footers <br />and reclaim tunnel walls: <br />3,000 c.y. x 195/c.y. _ $588,000.00 <br />Disposal on site: <br />3,000 c.y. x $4.64/c.y. = 13,920.00 <br />Conveyor demolition: <br />Overhead <br />1,250 ft. x $20.00/ft. = 25,000.00 <br />Underground <br />750 ft. x $30.00/ft. = 22,500.00 <br />Regrade site to AOC: <br />24,200 c.y. x .50/c.y. = 12,100.00 <br />Revegetate: <br />4 a.c. x $600/a.c. 2,400.00 <br />Total: $663,920.00 <br />Rounded to: $663,900.00 <br />As the bond amount for the stacking tubes and reclaim <br />tunnel exceeds MCC's reclamation bond surplus, a bond <br />rider will be obtained for this additional amount. <br />Construction of the stacking tubes is scheduled to <br />begin October O1, 1991. Please don't hesitate to <br />contact me should you have questions or if I can assist <br />you in any way. <br />Sincerely, <br />~~~ ~9 wee.-~ <br />Kathleen G. Welt <br />Environmental Engineer <br />KGW/mer <br />cc: J. L. Coffey <br />D. A. Echter <br />J. D. Miller <br />J. C. Poulos <br />P. G. Schmidt <br />