4I13l98 <br />Table A-1. Facilities Removal Calculations Page 4 of 5 <br />• FACILITYISTRUCTURE UNIT QUANTITY UNIT <br />COST EXTENDED ESTIMATED <br />COST COST <br />MISCELLANEOUS STRUCTURES (continued) <br />ANFO Silos -each <br />Structures Cu. Ft. 2,800 50.18 5504 <br />Concrete Sq. Ft. ~ 250 52.91 5728 <br />Footings Feet 20 58.21 5164 <br />Disposal Cu. Yd. 15 $5.30 580 <br />Total per silo 51,475 <br />a silos 85,901 <br />Explosive Storage <br />Magazine (3 total) Cu. Ft. 4,544 50.18 5818 <br />Trailer Cu. Ft. 2,880 50.18 5518 <br />Storage Bldg. Cu. Ft. 15,120 50.18 52,722 <br />(pole consWction) <br />Fence Feet 620 51.88 51,042 <br /> Es,1oo <br />Dragline Repair Pad (Queen Anne in B!C Pit) <br />Concrete: <br />Flalwork (Queen Anne Erection Pad) Sq. FL 4,900 52.91 514,259 <br />Disposal Cu. Yd. 121 55.30 5641 <br />514,900 <br />SUB-TOTAL (MISC. STRUCTURES) 534.699 535,000 <br />• MISCELLANEOUS ITEMS <br />Radio Tower (skid-mounted) Each 1 5500.00 5500 <br />Scrapyard G Storage Cu. Ft. 84.000 50.18 515,120 <br />Poles antl Lighting Each 20 555.00 51,100 <br />Waste Drum Disposal <br />Non-Hazardous Waste 55 Gal. Drum 19 5292.00 55.548 <br />Buried U8lities -Disposal Lump Sum 1 52.000.00 52,000 <br />Rip facilities area - D10N 8CY 80,667 50.19 515,327 <br />SUB-TOTAL 539.595 540,000 <br />SUB-TOTAL ALL FACILITIES (for items listed above) <br />AREA ADJUSTMENT FACTOR: 1.12% (for items listed above) <br />TOTAL FACILITIES (far items listed above, based on 1997 costs) <br />51,124,000 <br />513,000 <br />51,137,000 <br />Dragline Repair Pad (Molly Brown in 0.Pit) <br />Concrete: <br />FlaM1vork (Erection Pad: 70'x70'x8" reinforced) Sq. Ft. 4,900 54.04 519,796 <br />Flatwork (Transformer Pad: 15'x15'x4" plain) Sq. Ft. 225 52.03 5457 <br />Disposal Cu. Yd. 124 55.25 5651 <br />Rairoad Track Panels: <br />Removal (Erection Pad) L.F. 140 56.19 5867 <br />Removal (Erection Pad) L.F. 484 58.73 54,225 <br /> 525,996 526,000 <br />Area Adjustment Factor (for Molly Brawn site): 6.5% 51,690 52,000 <br />SUB-TOTAL (Molly Brown Tub Erection Site, based on 1998 costs) 527,685 528,000 <br />GRAND TOTAL FACILITIES REMOVAL 51,165,000 <br />rgd`~pennits`gr4Uacilrtnv.xl5 ~ M~-/~ ~ AAR <br />rY 2 7 19art <br />