Laserfiche WebLink
~ -32- <br />To properly address the concerns raised during the bond calculation <br />review, the operator needs to submit a revised reclamation cost <br />estimate for the worst case disturbance occurring during the <br />remainder of there permit term. The revised calculations must <br />incorporate the new hourly cost figures, production rates and <br />additional reclamation tasks required to completely reclaim the <br />Chimney Rock Mine. <br />tgr/6274F <br />