Laserfiche WebLink
<br />1 <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />1 <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />II <br />EXHIBIT D (Cont'd) <br />average being 154,300 tons/acre. At the rate of 154,300 tons/acre, <br />approximately 1.61 acres will be mined annually throughout the <br />life of the mine. The five-year stages will contain an average <br />of approximately 8.04 acres +. Comparison of the following <br />estimated timetable with map Exhibit D-1 indicates where the <br />operation will begin, where it is going and an estimate of how <br />long it will take. <br />Stage Years <br />Total Mined <br />Acres ± <br />Total Acres <br />I 1 to 2 <br />II 4 to 6 <br />III 4 to 6 <br />IV 4 to 6 <br />V 4 to 6 <br />VI 4 to 6 <br />VII 4 to 6 <br />VIII 4 to 6 <br />IX 4 to 6 <br />X 4 to 6 <br />XI 4 to 6 <br />XII 4 to 6 <br />XIII 4 to 6 <br />XIV 4 to 6 <br />P 53 to 80 <br />R Complete <br />17.09 <br />10.53 <br />8.30 <br />7.10 <br />7,05 <br />6.52 <br />7.06 <br />6.55 <br />6.77 <br />6.13 <br />6.56 <br />6.62 <br />6.61 <br />9.63 <br />0 <br />11'L . 5'L <br />17 <br />28.24 <br />14.78 <br />10.73 <br />9.40 <br />9.07 <br />9.00 <br />10.31 <br />9.09 <br />9.54 <br />9.34 <br />12.27 <br />7.85 <br />8.31 <br />15.33 <br />35.15 <br />'L VY .41 <br />