My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REV03998
DRMS
>
Back File Migration
>
Revision
>
REV03998
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 1:02:00 AM
Creation date
11/21/2007 9:13:57 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981041
IBM Index Class Name
Revision
Doc Date
6/5/1997
Doc Name
FAX COVER
From
DMG
To
DAN
Type & Sequence
PR2
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
JLN 05 '97 07~32RM DIVihIINERRLS&GEOLOGY <br />•..: 01~t8. '00 00:48 ID:LANIEI~AX3800 <br />POWDEAHORNI <br />COAL COMPANY <br />June O, x997 <br />FAX <br />FHX~ <br />Mr. Larry Routten <br />Colorado Division of Mineralr and Geology <br />1313 Sherman Street, Room 215 <br />Denver, CO 90203-2273 <br />RE: Outstanding Midterm Review Issues C-91-041 <br />Dear MY. Rautten: <br />P.2i4 <br />Pt]C~ 1 <br />-d. ~ YtlD <br />PYMO,, Calw~ 01610 . <br />(NO) ~OF7L71 <br />Fa'OI701 ~77n <br />Fer our conversation last week, i am sending a list of issues <br />that I stall have with the midterm review for our permit. These <br />issues are listed by numbers that have been carried through the <br />review process. The latest letter being responded to is a letter <br />from pan dated April 25, 1997. Many of the remaining requests in <br />this letter will be taken care Of. The following are the <br />questions that may need mitigation: <br />- 90. I have had non-discharging sumps and berme and other <br />drainage control structures in my permit for years. All of <br />a sudden I am asked how I will dewater one of them. I <br />offered to pump it to another pond once it had settled. It <br />would be a minor amount of wafer, it would be settled prior <br />to pumping and would be pumped at a non-critical period. I <br />donut believe that this scenario would affect the size of <br />the receiving pond. My current thought ie that all of my <br />alternate sediment control structures are or will be listed <br />in my Storm water permit and a statement to that affect <br />co::ld be included in out M&R permit. <br />96. Thies queetiori hag <br />The rRaponae that <br />issue of a person <br />evaluating work w <br />certain amount of <br />to do with headwater design of oulvert. <br />I have~had to my design brings up the <br />without professional certification <br />ith profeeeienal certification. There is a <br />logic and judgement that goes along with <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.