Laserfiche WebLink
<br />ROADAE LE EQUIPMENT: <br />__________________ Toca1 Eqp. <br />Machine Description Cosc/hr <br />u <br />FLeet Size Haul Trip Return Trip <br />fno. hauled) Cosc/hr Cosc/hr <br />Subtotals 50.00 <br />MOB/DEMOB SVPPORT EQUIPMENT: <br />"'-"""""""'-' "-"-"-" weigh[ Ownership Haul Aig Fleet Size Haul Trip <br />Non-Roadable Eqp. Description Icons) Cost/hr Cost/hr (no, hauled) Cosc/hr <br />$0.00 <br />sheet 2 of 2 <br />Return Trip DOT Permit <br />Cosc/hr Cosc/ea <br />= Subtotals 50.00 50.00 50.00 <br />total Eqp. Flee[ Sixe Haul Trip Return Trip <br />Roadable Eqp. Descripc ion Cosc/hr fno, hauled) Cost/hr Cost/hr <br /> Subtotals 50.00 <br />_________ <br />_ 50.00 <br />________ <br />EQUIPMENT HAUL DISTANCE 6 TIME <br />...~..~~..~..»..a.._........~ <br />Nearest major city or toum wi <br />thin <br />project <br />area region: <br />Lyons <br />_________________ <br /> <br />___________ <br /> <br />_____ <br /> <br />__________ <br />Total one way [ravel distance 10 <br />____ .0 <br />__ miles. Average [ravel speed = <br />___ 30.00 <br />__________ mph, <br />Job Time - Non Roadable Equip.= 0. 50 hours load Roadable Equip.= N/A hours load <br /> 0. 73 hours haul 0.33 hours haul <br /> 0. 50 hours unload N/A hours unload <br /> 0. 73 hours return 0.33 hours return <br />JOB COST <br />Total Mob/Demob Cos[ = 51, 258.8 <br />NOTE: Non-roadable equipment (haul rig required co transport) mob/tlemob costs based on 2 round trrps, each Grip <br />consisting of a one-way loaded haul and a one-way empty return. Roadable equipment (no haul rrg requiredi <br />costs based on one round Grip. Colorado DOT requrres special permits for oversize equipment on certain <br />specified road segments within Che State. Sepa ra ce permits are required for each rig on each loaded trip. <br />Add is iona ll y, pilot cars lone or two per r[g depending on degree of overs izel are also requiretl for overs [ze <br />equipment hauling, and loading/unloading crmes must be increased substantially for equipment which must be <br />partially dismantled Eor cranspocc and re-assembled at the job site. Costs Eor lif cing equipment and ocher <br />support equipment needetl for this work should be included in the mob/demob costs. <br />