Laserfiche WebLink
- Colorado Divisron of Minerals and Geology <br />ESTIMATING FORM - EQUIPMENT MOBILIZATION / DEMOBILIZATZON <br />Task p... 6 Prep. by CL% Fil ename,.M085-6 <br />Date..... 03-Feb-98 Permit q M-B6-OBS Mine......LOUkonen Quazry <br />Permit Action........ Recalculation of bond <br />Task Description..... Mob/demob <br />sheet 1 of 2 <br />HOURLY EQVIPMENT COST <br />_-+___-• ............. NOTE - This rs a lisC to select from, not a list of mandatory items Go include. <br />Mob/Demob Eqp. -Tractor <br />•Lt. Trailer <br />•Me tl. Trailer <br />-HVy. Trailer <br />-Pilot Car <br />-Hyd. Crane <br />-Fuel Truck <br />-Cube Truck <br />-Flatbed Truck <br />Last Update: <br />December, 1994 <br />6x9, 75,000 16 G'1N, 775 HP, diesel powered <br />25 ton folding gooseneck, drop deck <br />50 con folding gooseneck, drop deck <br />120 Ton folding gooseneck, drop deck <br />On-highway light duty truck, 4x2, 130 hp, 1/2 ton rating, gasoline powered <br />Grove RTSBD tough terrain hydraulic crane, 20 ton capacity, 125 hp, 60 f[. boom <br />fi x4, 3,600 gallon capacity, 210 HP, diesel powered <br />6x4, 2,500 gallon capacity, 210 HP, diesel powered <br />20,000 lb GVH, 175 HP, diesel powered <br />" "--'-" " "' Lt. Rig Med.Rig Hvy.Ri9 Pilot Hydraulic Fuel Lube Flatbed <br />Cost Breakdown: <-25 T . 26-50 T. > SO T. Car Crane Truck truck Truck <br />....._.....p . <br />Ovnershi ........ <br />Coat/hr :...... <br />$25. ... <br />34 ......... <br />$27.62 ............ <br />$31.12 . <br />51.72 <br />$21.81 <br />$6.78 <br />512.48 <br />55.81 <br />Operating Coac/hr = $25. 78 527.34 $29.73 55.23 $2 B.fi0 $18.12 524.11 $7.98 <br />Operator Coat/hr - $21. 90 $22.03 522.03 521.29 $21.17 521.24 $21.24 521.29 <br />Helper [oaC/hi 520. 60 521.29 $21.24 $0.00 50.00 $0.00 $0.00 50.00 <br /> Total 593. 12 $98.27 $104.12 528.19 573.54 596.19 $57.83 $35.03 <br />NON-ROADABLE EQUIPMENT: <br />'--" " "-" -'--" " " Neighs Ownership Haul Rig Elect Size Haul Trip Return Trip DOT Permit <br />Machine Description (tons) CosC/hr Cost/hr (no. hauled) Cost/hr Coat/hr Coet/ea <br />Cat DBN 40.00 $90.05 $98.23 2 $276.56 519fi .46 <br />Reveg. Equipment <br />15.00 570.00 $93.12 1 $123.12 $97.12 <br />Subtotals $]99.68 $289.$8 50.00 <br />