Laserfiche WebLink
1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />t <br />EXHIBIT D (Cont'd.) <br />The operator's intention is to minimize disturbances to the <br />prevailing hydrologic balance of the affected land and of the <br />surrounding area and to the quality and quantity of water in <br />surface and ground water systems during and after the mining <br />operation. <br />Minine Timetable <br />The following timetable is based on the best projected <br />estimate of future demand. Any economic variation from the <br />current norm could, and probably will, radically change all of <br />the timetable estimates. <br /> Substage Stage <br />Stage Years Total Acres Yd.3 x 1000 Yd.3 x 1000 <br /> <br />lA 10.01 190 <br />1B 3.97 115 <br />Subtotal 5z- 7Z 13.95 340 <br />2A 8.13* 285 <br />2B 5.53 75 <br />Subtotal 4~- 6~ 13.66* 360 <br />3 2 - 4 6.96 230 <br />4A 2.37 70 <br />4B 4.05 225 <br />Subtotal 2 - 4 6.42 295 <br />5 2 - 4 8.71 365 <br />6 1 - 3 10.19 165 <br />Stockpile 1 - 3.54 <br />H ~ <br />s. - <br />Stockpile 2 - , <br />.~ <br />3.54 - <br /> 5 <br />Access Roads - 1.41 ~ Nu - <br />Totals 17- 29 '~ 69.32~~~ 1,755 <br />*Does not include area in Stage 1B which is mined in two different <br />stages. <br />13 <br />