My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2004-05-17_REVISION - M1984026
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1984026
>
2004-05-17_REVISION - M1984026
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 2:41:19 PM
Creation date
11/21/2007 9:09:14 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1984026
IBM Index Class Name
Revision
Doc Date
5/17/2004
Doc Name
Final Response to AM-1 Adequacy Review
From
LJ Development Inc
To
DMG
Type & Sequence
AM1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
34
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
(iii) State the species to be planted and applicable quantities: <br />Species Varied #/Acre PLS <br />Crested Wheatgrass Nordan 2.0 <br />Western Wheatgrass Arriba 3.0 <br />Intermediate Wheatgrass Tegmar 3.0 <br />Indian ricegrass Nezpar 5.0 <br />13.0 #lPLS <br />(iv) Application method for grass seeding: <br />The seed will be applied by a drill with a competent agitator. It will <br />be drilled across slope on the backslopes. If seed should be broadcast, <br />the rate will be doubled. <br />(v) Mulch, if necessary, and rates of application: <br />Straw or grass mulch will be applied and crimped in at the rate of <br />4,000#/A as recommended. <br />(vi) Establishment method for each species of shrub or tree: <br />No shrubs or trees are proposed for this wide-open rangeland area. <br />(d) Specify which ponds, streams, roads and buildings will remain after <br />reclamation: <br />;1,=:: ~ , -The~~proposed recharge as described in this reclamation plan will remain. The <br />haul road will remain to act as a maintenance access for the recharge basin <br />and high-voltage electric lines. <br />(e) Specify the reclamation treatment of any waste rock dumps, tailing <br />impoundments. underground mine openings, ditches, sediment control <br />facilities, buildings and other features not addressed: <br />This will be an open-pit surface mining operation. All rocks will be used in <br />production so there will be no waste rock. There will be no dumps, tailing <br />impoundments, underground mine openings, ditches, sediment control <br />facilities, buildings or any other features not involved in this narrative involved in <br />any way in this operation. <br />A low earthen berm will be established to keep all stormwater on-site, this will <br />minimize disturbance to the hydrologic balance, and prevent off-site damage. <br />This will help provide a stable configuration consistent with the proposed future <br />land use. <br />
The URL can be used to link to this page
Your browser does not support the video tag.