My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2004-05-17_REVISION - M1984026
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1984026
>
2004-05-17_REVISION - M1984026
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 2:41:19 PM
Creation date
11/21/2007 9:09:14 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1984026
IBM Index Class Name
Revision
Doc Date
5/17/2004
Doc Name
Final Response to AM-1 Adequacy Review
From
LJ Development Inc
To
DMG
Type & Sequence
AM1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
34
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
(b) a statement that a reclamation permit for the operation has been issued by <br />the Colorado Mined Land Reclamation Board; and <br />(c) the permit number. <br />(2) The boundaries of the affected area will be marked with monuments, that are <br />clearly visible: <br />(a) This is a 112 operation, therefore, the permit boundary and the affected <br />boundary are not the same, and the operator/applicant is proposing a floating bond to <br />cover a portion of the site, to allow mining and reclamation to be ongoing. <br />(3) The affected land will be monumented for easy delineation. <br />----END applicable Requirements of Section 3.1 <br />(d) Where applicable, the operator/applicant has plans developed for the segregation, <br />preservation, replacement, compaction and grading of soil used for revegetation. The <br />revegetation plan will contain a list of the preferred species of grasses to be planted <br />as recommended by the field office of the NRCS. All seeds recommended should be <br />available and in sufficient quantity to accomplish the revegetation. <br />Seedbed preparation has been covered in Section 3.1 of this application. <br />(e) The schedule of reclamation will closely follow the mining phasing, and the <br />operator would expect to start reclamation as soon as feasible after mining has been <br />completed. <br />:~,- <br />The final grading also will be done in conjunction with mining. All backsloping and <br />contouring will be done as mining progresses. <br />Measures that will be taken to revegetate the site: <br />(i) Basin side slopes will be graded to a maximum 3H:1V to 10 feet <br />below the expected average water surface level. Side slopes below this <br />will be graded to a maximum 2H:1V. Side slopes above the expected <br />average water surface level and any other disturbed areas will be <br />topsoiled to a depth of 4-fi" and revegetated. The floor of the basin will <br />be graded and smoothed but not topsoiled as not to inhibit recharge. <br />See maps. <br />(ii) Time of seeding, seedbed preparation, type, application rate and soil <br />incorporation, method of fertilization application. <br />Fall seeding is preferred and proposed if at all possible. The seedbed <br />will be scarified and it will be across the slope in the backsloped area. <br />Seed will be drilled rather than broadcast. No fertilization is proposed. <br />Straw or grass hay will be applied at the rate of 4,000#/A. <br />
The URL can be used to link to this page
Your browser does not support the video tag.