My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2004-05-17_REVISION - M1984026
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1984026
>
2004-05-17_REVISION - M1984026
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 2:41:19 PM
Creation date
11/21/2007 9:09:14 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1984026
IBM Index Class Name
Revision
Doc Date
5/17/2004
Doc Name
Final Response to AM-1 Adequacy Review
From
LJ Development Inc
To
DMG
Type & Sequence
AM1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
34
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
3.1.8 Wildlife <br />(1) The operator will consider the safety and protection of wildlife on site. No <br />described critical periods or species are known by this operator/applicant or <br />landowner. <br />(2) No habitat management is planned on this site. <br />3.1.9 - Topsoiling <br />(1) Topsoil will be stockpiled in close proximity to the mine areas in order to shorten <br />haul distances to and from the areas that were stripped. Once the topsoil has been <br />removed and segregated from the other spoil or product, it will be saved for <br />replacement. If the duration before use exceeds one full growing cycle, the topsoil <br />stockpiles will be seeded with a wheatgrass to control erosion. <br />(2) Mining on the affected lands will disturb little to no~woody'vegetation, however, if " <br />any large volumes of woody vegetation are produced, they will be properly placed in <br />areas segregated from the topsoil stockpiles. <br />(3) Stockpiles will be configured to minimize erosion and will be located in areas <br />where disturbance by ongoing mining operations will be minimized. As stated in <br />3.1.9 topsoiling (1) above, if necessary, stockpiles will be seeded for the purpose of <br />stabilization. <br />(4) It is planned to locate topsoil stockpiles so material will only have to be handled <br />°'. one time. No relocation of topsoil is proposed. `5 " '~ " ' <br />(5) The operator will take measures to assure the stability of replaced topsoil on <br />graded slopes by roughing the subgrade to gain a mechanical bond to the topsoil <br />being replaced. This should insure the elimination of any slippage zones. <br />(6) It is the operator/applicant and landowners opinion that the topsoil present on site <br />is adequate to establish the seed mix recommended by the NRCS. No replacement <br />topsoil is planned to be imported for reclamation. <br />(7) Fertilization: None as per NRCS recommendation. <br />(8) Vegetative piles, if any, will be minimal and shall be removed from the area or <br />utilized in the reclamation of the mine site. <br />3.1.10 Revegetation <br />(1) In the revegetated areas, the reclamation plan has been designed for pasturing <br />cattle with grasses that self-regenerate without continued dependence on irrigation. <br />Fertilization will be as per NRCS recommendations. <br />
The URL can be used to link to this page
Your browser does not support the video tag.