Laserfiche WebLink
<br />-3- <br /> <br />b. small dozer (D-5 or equivalent) to maintain maneuvering areas at <br />the stockpile and backfill area. <br />Both estimates should include the cost of drainage reesta6lis~ent, <br />topsoiling and revegetation of the stockpile area once the ma erial is <br />removed. <br />If the permittee wishes to post a financial warranty for off- ite <br />removal, the Division would be willing to consider increments warranty <br />releases as material is removed from the site. <br />SGR/es <br />2334E <br />