My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1993-03-29_REVISION - M1985212
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1985212
>
1993-03-29_REVISION - M1985212
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2021 8:00:04 PM
Creation date
11/21/2007 9:08:51 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1985212
IBM Index Class Name
Revision
Doc Date
3/29/1993
Doc Name
REQUEST FOR AMENDMENT
Type & Sequence
AM2
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i <br /> /J7 <br /> Mining - Reclamation - A.P cont . <br /> s�i& 3 <br /> Arkins Park South - Five Stones - This area has been o ened and <br /> is being quarried to replace the Trupp quarries which a e in the <br /> process of reclamation. <br /> Mining Plan : An access road was constructed from the alley to <br /> the west . We plan to remove stone first from the nort side of <br /> the draw. It will be removed from the south toward t e north- <br /> west . The processing is being done on a work deck to the east <br /> and in the valley to the west where the access road en ers the <br /> draw. A process area , loading area and storage area is located <br /> there . We plan in the future to remove stone from the so th side <br /> of the draw which would be an extension of an existin quarry <br /> that was operated by Colo . Stone Co. 10 - 30 years a o . We <br /> expect to gain access from the west side of the mountain similar <br /> to the access to the north part of this area . The of access <br /> road from the east is so steep and rough that the large trucks <br /> cannot get up the hill and it is very dangerous to try to get <br /> them up the hill and around the sharp curve . <br /> Reclamation Plan : When depleted these areas will be re !aimed <br /> according to the specifications of the other quarries n this <br /> area following the contour of the mountain as close as is <br /> feasible . We expect these areas to be producing for long <br /> length of time . <br /> & Arkins Park South - The west part of this quarry h s been <br /> depleted and we plan to reclaim about 1 acre on the top in the <br /> near future at the same time as the reclamation will be one on <br /> the Trupp quarries . We have already re-seeded the south side of <br /> the draw that is to the north of the quarry area and it is doing <br /> very well . We plan to continue quarrying on the north s ,de of <br /> the draw in the lower parts as the demand for that color an� type <br /> of stone is needed . <br /> Enclosed are amended maps as required for each area. <br />
The URL can be used to link to this page
Your browser does not support the video tag.