My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REV03379
DRMS
>
Back File Migration
>
Revision
>
REV03379
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 1:01:11 AM
Creation date
11/21/2007 9:08:18 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981033
IBM Index Class Name
Revision
Doc Date
9/23/1982
Doc Name
APPROVE WITH CONDITIONS
From
MLR
To
BEAR COAL CO
Type & Sequence
MR1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• • STnTE OF COLOR4D0 RIC HARI~L~finve mO~ <br />DEPARTMENT OF NATURAL RESOURCES <br />D. Monte Pascoe, Executive Der ector <br />-~~~ iVIP.VED LAND RECLAIVIATION <br />423 Centennial Building, 1313 Sherman Street <br />Denver, Colorado 80203 Tel. (303) 866-3567 <br />David C. Shelton <br />Direcior <br />September 15, 1982 <br />I~ <br />TO: Dan hla thews \ 1 ~!\~~,,-~_ <br />FROA1: Jim Pendleton ~~' -a/~ ~-~}"'~-- <br />~"~ /~ <br />RE: Meeting with A~ii'O a ~d~Baar Coal Companies, Tuesday, <br />September 14, 1982 <br />In your absence from the office, yesterday, Ed Bischoff, Fred Banta and <br />myself met with representatives from Bear and ARCO Coal Companies. The <br />purpose of this meeting was to discuss a proposed revision to the back- <br />filling scheme for the portal cut at the Bear No. 2 underground coal mine. <br />Bear Coal Company proposes to backfill the portal cut of the Bear No. 2 Mine <br />with underground development waste generated from the Mt. Gunnison No. 1 <br />Kline. During the meeting, we arrived at the following conclusions: <br />(1) This revision would be treated as a minor revision to <br />permit C-033-81 for the Bear coal mines. <br />(2) The underground development waste material would be <br />transported, placed in two foot lifts and compacted in accordance <br />with stipulation no. 9 of permit C-033-8I. Material Proctor testing, <br />placement, compaction, inspection and certification would be completed <br />by ARCO Coal Company, operating as a contractor for Bear Coal Company. <br />(3) The underground development waste material would be backfilled <br />to the height of existing intermediate bench above the portal entries <br />at the Bear No. 2. A final slope of 2:1(horizontal to vertical slope) <br />would be maintained, resulting in a set back from the existing bench <br />lip of the portal bench of the Bear No. 2. The fill material <br />would be covered with a minimum of I foot of appropriate soil and re- <br />vegetated in accordance with the permit standards. <br />(4) Bear Coal Company will be responsible for all monitoring and <br />reclamation success requirements included within permit No.~C-033-81 <br />and its attendant stipulations. <br />Bear coal should be forwarding a written proposal of these procedures for <br />approval by the Division. The coal companies indicated arrival of that <br />proposalimmanently. Please contact me if you require assistance in review of <br />their submission. <br />~_ <br />.li-. J ~I <br />
The URL can be used to link to this page
Your browser does not support the video tag.