My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REV03379
DRMS
>
Back File Migration
>
Revision
>
REV03379
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 1:01:11 AM
Creation date
11/21/2007 9:08:18 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981033
IBM Index Class Name
Revision
Doc Date
9/23/1982
Doc Name
APPROVE WITH CONDITIONS
From
MLR
To
BEAR COAL CO
Type & Sequence
MR1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
~i N <br />Bear Coal Company <br />Somerset, Colorado 81434 <br />September 16, 1982 <br /> <br />Mr. Jim Pendleton <br />Mined Land Reclamation <br />423 Centennial Building ~~=!~ <br />1313 Sherman Street <br />Denver, colorado 80203 ~'-~~~!~ . ! -~ ,: I'~;,; A.r.7;',IIfI~J <br />.,. '. ['%GI Si ~i J:IJi `~ lip $U L'f (. L•S <br />Dear Jim: <br />Bear Coal Company requests a minor revision to its existing Recla- <br />mation Plan for the Bear #2 mine. <br />As part of the backfill of the #2 mine, a minor change from the <br />approved plan is being proposed. The proposed backfill now in- <br />volves placement of mine waste material (roof and floor with some <br />coal) on the existing portal level. The material will be placed <br />12 feet to 15 feet back from the edge of the portal bench. The <br />material will be placed against the highwall and have a final <br />slope of not greater than 1V:2I1. <br />Material will be placed by trucks and/or scrapers and compacted <br />to 958 (as possible) Standard Proctor Density. After final place- <br />ment of the waste material, a cover of one (1) foot of clean soil <br />will be placed. The clean soil will be revegetated. The waste <br />material will be obtained from the Mt. Gunnison Mine of the West <br />Elk Coal Company. <br />All responsibility for monitoring and stability of this area, as <br />indicated in Bear Coal Company's M&R Plan will be the responsibility <br />of the Bear Coal Company. <br />A copy of the final as built cross section and volumes of the <br />backfill will be sent to MLRD upon completion. <br />Your timely response to this request would be appreciated as we <br />would like to complete this activity while the weather is still <br />favorable. <br />Should you have any questions, please call 929-5775. <br />Sincerely, <br />William A. Bear <br />President <br />
The URL can be used to link to this page
Your browser does not support the video tag.