Laserfiche WebLink
STATE of Coi c~rznno <br />•~ iii iiiiiiiiniiiiii <br />uir ,... ~~~ i~ i. n r,,,v,.,.,,,, 999 <br />DEPARTMENT OF NA7UgAL RESOURCES <br />D. Monte Pascoe, Execu true Director <br />iV1LNED LAND RECL.Al~1A'I'ION <br />423 Centennial Building, 1373 Sherman Street <br />Denver, Colorado 80203 Tel. (3031 866-3567 <br />David C. Shelton <br />Director <br />September 23, 1982 <br /> <br />Mr. William A. Bear <br />Bear Coal Company <br />Sommerset, Colorado 81434 <br />Lear Mr. Bear: <br />The Division has reviewed the minor revision request for backfilling the <br />Bear No. 2 portal cut with underground development waste from the Mt. <br />Gunnison No. 1 Pfine. The application is deemed complete and the Division <br />approves the minor revision. The approval decision is based on the fact <br />that the material strength characteristics of the Mt. Gunnison No. 1 Mine <br />underground development waste does not vary significantly from the originally <br />anticipated Bear No. 2 Mine backfill. The Division does not consider the <br />revision to constitute a significant change in the reclamation plan. <br />Conformance with stipulations No. 8, 9, and 10 of permit No. C-033-81 will <br />continue to be strictly enforced. These stipulations require compaction <br />testing of backfill material prior to placement, and engineering super- <br />vision, inspection, and certification of the placement, compaction and <br />final grading of the backfilled material. Following completion of the <br />backfilling, the operator is responsible for the installation and monitoring <br />of slope stability monuments. <br />If you have any questions, please contact me. <br />Sincerely, <br />~a~ ~~~ <br />Dan Mathews <br />Reclamation Specialist <br />DM:ys <br /> <br />cc: Floyd Johnson <br />