PHILLIPS MINING, GEOTECHNICAL 8 GROUTING, INC. <br />construction area in a 3 inch diameter stainless steel pipe. This pipe should be fitted with a <br />coarse mesh on its inlet end, to avoid plugging it, and have two stainless steel seal rings <br />attached around the outside. These rings, 1/4 inch thick, must be fully welded around the <br />complete perimeter of the pipe, and be located some 2 ft and 4 ft from the wet end of the <br />plug. The rings should form a solid collar extending about 4 inches outside the exterior <br />surface of the pipe, and as such, will be well embedded in concrete and so will prevent any <br />leakage along the outside of the pipe. <br />After the completion of the plug, this water drainage pipe will be used to monitor the <br />build-up of pressure on the plug. The necessary fittings, including a 0 to 25 psi. pressure <br />gauge and valves, must be supplied to allow this to be accomplished. However, when <br />pressure monitoring is no longer necessary, this pipe will be plugged with anon-shrink <br />grout. Provision should be made in the placement and/or in the configuration of the pipe <br />such that successful plugging of this pipe can be performed. <br />Complete filling of the drift around the timber cribbing and sets will be difficult to achieve <br />during concrete placement. Subsequent grouting azound the plug will be used to complete <br />the filling of the adit. However, the installation of standpipes through the timber at the <br />optimum orientation around the plug to direct grout into the open zones, can only be <br />achieved in a relatively short plug. Therefore it is intended that the plug should be <br />constructed in two monolithic concrete pours, each approximately 12 feet long, over the <br />complete drift cross section. <br />If for some unavoidable reason, either concrete pour cannot be completed without a stop <br />such that there is a possibility of forming a horizontal concrete cold joint, the top surface <br />of the fresh concrete must be treated with a chemical surface retarder. This retarder must <br />be compatible with the aggregate size and which will etch deeply into the concrete, such <br />as Fosroc Preto EAC-S-Deep, or equivalent. This will delay the set of the cement paste <br />Page 4 <br />