Laserfiche WebLink
<br />Mr. Lawrence G. White, P.E. -7- October 28, 1994 <br />2. Please clarify the operator's intentions relative to groundwater well reclamation and/or <br />transfer to landowner possession pursuant to Rule 4.05.14 (Transfer of Wells). <br />3. .Previously submitted and approved page 88 depicts a cross section of the refuse pile, but <br />the most recent TR-07 submittal presents a page 88 with text. Please correct. <br />4. The new page 88 seems to incorrectly reference Drawing TP-3, rather than TP-5. Please <br />clarify. <br />5. The existing permit contains a diagrem at page 87, but the most recent TR-07 submittal <br />provides a page 87 with text. Please correct this, and review the TR-07 pagination in <br />general for any needed corrections. <br />Bond <br />Please be aware that we are in the process of conducting an in-house calculation of the. existing <br />bond liability for the entire permit area. We will forward our calculations for your review as <br />soon as they are available. <br />Please contact us with any questions and thank you for your patience and cooperation throughout <br />this process. <br />Sincerely, <br />Environmental Protection Specialist <br />DAB/bjw <br />ce: Shawn Smith <br />M:\oss\aiw\ons <br />