Laserfiche WebLink
9) AVS evaluation shows a current AML violation for Lodestar Energy, Inc., Kentucky <br />PetYrtit 8980503 dated 6/30/00. LEI needs to provide documentation showing that the <br />violation has been resolved, or documentation showing that LEI is not the current <br />operator of the referenced permit, and vas not the operator on 6/30/00. <br />Response: A current A US evaluation should show that all AML violations and unpaid AMI, fees <br />have reeently been cleared up. <br />2.03.6 Right of Entrv and Oceration Information <br />10) Information in Appendix C regarding federal and private coal leases and fee ownership <br />references the former permittee, Grand Valley Coal Company. The section needs to be <br />updated to document the transfer of ownership and leases to Lodestar Energy, Inc., as <br />appropriate. Figure 1.1-3a should be similazly amended. <br />Response: .see uttaclrment Issue #i10. Appendix C has been updated. Please replace page C-I <br />and add pages C-6 and C-7 to uppendix C. An amended Figure 1.1-3a is also included <br />11) Narrative in Section 1.0 (Introduction) of the permit application should be updated to <br />reflect operational changes which have occtured since the 1996 Renewal, including the <br />permit transfer from Grand Valley Coal Company (GVCC) to Lodestar Energy, Inc. <br />(LEI), and resumption of coal production. References to GVCC should be changed to <br />LEI, as appropriate. <br />Response:.see attachment Issue iill. Narrative in Section 1.0 (/ntroductton) of the permit <br />application was updated to reflec[ operational changes which have occurred since the 1996 <br />Renewal. Please insert new page 1-6a of Section L0. <br />2.05.2 Operation Plan -Estimated Area for Life of Operation, and 2.05.3 Operation Plan -Permit <br />Area <br />12) Please amend mine plan narrative in Section 2.1 as necessary to accurately reflect current <br />mining operations and projections. The development sequence narrative under Mine <br />Design, on page 2-13, appears to be out of date and should be amended. Reference to <br />mine inflow from the Cameo Seam on page 2-23 should be updated to reflect conditions <br />encountered during the current permit term. The entirety of Section 2.1 should be <br />reviewed and amended as appropriate. <br />Response: see attachment /ssue #12. The narratives in Sectton 2.1 have been amended to <br />accurately reflect currer:t mining operations and projections. Please replace pages 2-3, 2--1, 1- <br />13, 2-l9, 2-23, 2--15, and 2--t7. <br />5 <br />