Laserfiche WebLink
1L <br />Janet Binns <br />21 October 1996 <br />Page -2- <br />• <br />• <br />4) Area 41 (Phase Three Bond Release -fear One) <br />• This area (190.1 acres) will be sampled for cover and production to <br />sample adequacy. <br />• This area was selected for Phase Three Sampling because the parcels <br />will all meet the ten-year regiiireinent and it is separated from the rest <br />of Eckman Park by drainage. Therefore, it makes sense to sample it as <br />a separate block. <br />It is our hope that this documentation, along with our discussions at our meeting of <br />October 9, 199G, will help us meet our sampling goals. <br />If there are further questions, please feel free to contact either Rick Mills or myself <br />at your convenience. <br />Sincerely, <br />~a~~ ~~~~~-~ <br />Gayle E. Noonan <br />