Laserfiche WebLink
~ i <br />Reclamation of the surface disturbance areas has not changed the drainage control <br />facilities for the site which are described in the approved permit. Figure 1 shows the major <br />1 drainage control features contained on the site. These features will be maintained through <br />1 the Phase II release period, at which time all drainage control structures will be removed. <br />M <br />1 <br />