My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REV02723
DRMS
>
Back File Migration
>
Revision
>
REV02723
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 1:00:26 AM
Creation date
11/21/2007 9:03:12 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981013
IBM Index Class Name
Revision
Doc Date
7/27/1992
Doc Name
WYOMING FUEL CO GOLDEN EAGLE MINE PN C-81-013 TR 20 RAW COAL RECLAIM SYSTEM
From
BASIN RESOURCES INC
To
MLRD
Type & Sequence
TR20
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Division of Minerals and Geology <br />Golden Eagle Mine TR 20 <br />July 21, 1992 <br />Page 2 <br />2. The proposed censtruction area has been used for <br />race coal stockpiling in the past. Therefore, it is <br />anticipated that no topsoil or subsoil s. ill be <br />encountered. If suitable material is encountered, the <br />materisl will be added to the existing topsoil <br />stockpile, the new subsoil stockpile, or used in <br />contemporaneous reclamation of the coal processing <br />waste pile. <br />3. Construction of the coal reclaim structure and <br />stockpile ayes will require the excavation of <br />approximately 500-1,000 yards of bed roclt and gravels. <br />This materisl will be used for filling loo: cress or <br />disposed of at the coal processing casste pile. <br />Material suitable for use ss rip rap may be stocltpiled <br />for future use. The area designated for this purpose <br />is shown on map 10. <br />Ai F.mi s i one P rmi <br />The Golden Eagle Mine has Colorado Department of Health <br />Emission Permit No. 81LA300. This permit included <br />provisions for race coal to be placed into s surge pile by an <br />adjustable height stacker, conveyors to be partisllp <br />enclosed, and transfer points to be totally enclosed. These <br />conditions cuill be complied with by the new construction, <br />with the exception that the drop tube structure will provide <br />sn even greater measure of control of fugitive dust <br />emissions than the adjustable height stacker. <br />The lacy requires that all sir pollution sources submit to <br />the Division a Revised Air Pollution Emission Notice (APENI <br />by December 31, 1992. This revision will include the <br />Revised Golden Eagle Raw Coal Handling system. <br />pe mi R vitiOn~ <br />The new structures have been added to Table 16 - Surface <br />Facilities List, page 2.05-8 of the permit. These <br />facilities and the location for subsoil and rip-rap <br />stockpiles are shoran on Msp 10 Surface Facilities and Rosds. <br />Reclamation bonding requirements are calculated on Exhibit <br />19, Schedule TR-20. Three copies of each are enclosed. A <br />proposed public notice for publication in the local paper is <br />also enclosed. <br />
The URL can be used to link to this page
Your browser does not support the video tag.