Laserfiche WebLink
III IIIIIIIIIIIII III <br />999 <br />-~ <br />BASI N <br />RESOU RCES, ~N~. <br />a subsidiary of ENTECH, Inc. <br />Mr. Joseph Dudash <br />Reclsmstion Specialist <br />Mined Lsnd Reclsmstion Division <br />1313 Shermsn Street, Room 215 <br />Denver, Colorsdo 80203 <br />OIV151pN OF <br />i~11NEaALS & GEOLOGY <br />Re: Wyoming Fuel Compan3' <br />Golden Esgle Mine, Permit No. C-81-013 <br />TR-20 Raca Coal Reclsim System <br />Desr Mr. Dudash: <br />Please accept the enclosed spplicstion for s Technical <br />Revision to the Golden Eagle Mining Permit for the <br />construction of s Rsw Cosl Reclsim System. <br />This project consists of the following phases of <br />construction: <br />A. Construct a trsnsfer point on the slope belt <br />approximstel3' 80 feet south esst of the present coal <br />silo st the existing tslce-up tower. Relocste the belt <br />drive now st the cosl silo to the transfer point. <br />B. Construct sn spproximstel3' 100 ft. drop chute s,~ith <br />s reclaim tunnel spproximstel3. 200 feet to the east cf <br />the neg. transfer point. <br />C. Construct s 200 foot conve~:or system running from <br />the new transfer point to the drop tube, snd a 200 foot <br />conveyor s3•stem from the reclsim tunnel bsclc to the <br />existing breaker building. <br />In order to complete this construction work the following <br />additional sctivities are planned: <br />1. The subsoil stockpile sres caill be relocated. As <br />psrt of this sctivit3•, the existing topsoil and subsoil <br />nos. in stockpile will be used for contemporaneous <br />reclsmstion of the cosl processing c.sste pile. <br />14300 Highway 12 <br />Weston, Colorado 81091 <br />(719)868-2761 <br />FAX (719) 868-2275 <br />July 21, 1992 <br />DECEIVED <br />sup 271992 <br />