Laserfiche WebLink
j <br />-Page 2- <br />'Ihe steel boot will catch any spills resulting frtan the fluid being poured into <br />the 4 inch pipe. <br />Jeff, I have not included additional bowling calculations for this minor <br />revision. 4he reclamation of the crushing and screening level has been pre- <br />viously addressed. Zhe mall amotmt of concrete which will be used to modify this <br />structure (about 200 CF), would rxyt. significantly affect the reclamation bond. <br />Zhe material which has been revised as a result of this revision includes pages <br />24 thrnugll 26 of Section 2.05 in the permit docxmient. Additionally, Map 8-1 has <br />been revised. ale certified copies of Map 8-1 will be forthoominxJ. Please be <br />aware that the section Other Facilities has been reorganized and the format has <br />been updated. Also, within this section, a few minor changes have been amg~leted <br />whidn serve to reflect current conditions. Specifically, in the Water Suoply <br />descriptiaan, reference to the diesel generator has been deleted as the generator <br />is rrot used. Also, the building which houses the system is not pre-engineered; <br />thus, reference to such has been deleted. <br />Jeff, I certainly appreciate your assistance with this minor revision. If you <br />do require additional information, please contact John Menke and/or Bab Johnson. <br />Additionally, I world like to extend my gratitude for your oorttimaed cooperation. <br />It has been a pleasure working with you. <br />CYPfd]S CI~ARD VALIF'Y COP.L ODRPORA'FION <br />Claire E. Sm[mier <br />ErNir+onm~ental Specialist <br />CES:sct <br />Encl. <br />