My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REV02677
DRMS
>
Back File Migration
>
Revision
>
REV02677
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 1:00:22 AM
Creation date
11/21/2007 9:03:02 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981012
IBM Index Class Name
Revision
Doc Date
2/15/1990
Doc Name
REVISION TO NEW ELK PERMIT C-81-012
From
WYOMING FUEL COMPANY
To
MLRD
Type & Sequence
TR19
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
iii iiiiiiiiiiiiiiii <br />999 <br />UJ~oming Fuel Compon~ <br />Golden Eagle /New Elk Mines <br />10250 Highway 12 • Weston, Colorado 81091 • Telephone (779) 868-2761 <br />February 14, 1990 <br />Mr. Berhan Keffelew <br />ok ~y ~-~ <br />~~~cB G~~ Fri ~,~~ <br />RAC I~/~C`-' <br />Reclamation specialist FEB ;l5 1990 <br />Colorado Mined Land Reclamation Division MINED LAND <br />1313 Sherman street RECLAMATION DIVISION <br />Denver, CO 80203-2273 <br />Re: Revision to New Elk Permit C-81-012 <br />Dear Mr. Keffelew: <br />Wyoming Fuel Company (WFC) is requesting a revision to upgrade <br />the waste water collection system at the New Elk Mine. The upgrade <br />will consist of three modifications which include: (1) <br />installation of a vault and associated piping for sewage collection <br />from the Industrial Building; (2) installation of a vault and <br />associated piping for sewage collection from the Preparation Plant <br />and (3) installation of required piping for shower water <br />collection from the Industrial Building. Details of each <br />modification are described below and illustrated on the enclosed <br />drawing. <br />Sewage Collection from Industrial Building <br />A precast concrete vault (see attached diagram) will be <br />buried to ground level approximately 150' East of the Industrial <br />Building and a 4" sewer line will be connected from the existing <br />manhole to the vault. The manhole currently has two influent <br />pipes, one carries shower water while the other carries sewage from <br />the toilet locations. The toilet discharges would be directed to <br />the vault and periodically dumped by a licensed contractor and <br />disposed at an approved location. <br />Sewage Collection from Preparation Plant Buildino <br />The Preparation Plant currently has toilet facilities <br />which were a part of the original construction. However, there has <br />never been a collection system available to accomodate their use. <br />With the recent increase in coal production and manpower the <br />following construction is required to utilize the facilities. <br />Again, a precast concrete vault will be buried to ground <br />level approximately 600' East of the Plant building below the <br />embankment of Pond 006. A 4" sewer line will be connected from <br />
The URL can be used to link to this page
Your browser does not support the video tag.