Laserfiche WebLink
All backfilling tasks (equipment tasks) aze based on production ratings from <br />the Caterpillaz Performance Handbook. Operator and equipment costs come <br />from the Cost Reference Guide for Construction Equipment, the Contractor's <br />Equipment Cost Guide for Construction Equipment and the Colorado <br />Department of Transportation Labor Rate Data. Again, these are industry <br />standards. This helps eliminate any azbitrary calculations of bonds. <br />All of the above basically means that I am not prepazed to change anything in the cost <br />estimate (except the few items noted above). I believe that our bond was calculated <br />correctly based on the information contained in the permit. If you would like to meet <br />(again) with BRL to discuss this I would be happy to attend, as it would probably be <br />faster than sending multiple letters back and forth. <br />Please let me know if you have any questions. <br />cc: Sandy Brown <br />Dave Berry <br />