Laserfiche WebLink
D. T. Mathews - 3 - June 5, 2000 <br />The following revised pages and exhibits are included with this transmittal: <br />Page/Exhibit Comment <br />x Table of contents added Exhibit 60 <br />Tab3 Table of contents -noted deletion of tables 3-7 and 3-8 <br />T3-1-2 Corrected addresses <br />3-6 Updated permit term narrative <br />T3-2-1 - 4 Updated NOV list <br />12-1 - 6 Amended operation description to reflect current conditios <br />Tab 13 Table of contents added Exhibit 60 <br />T13-5-2 Added Unit train loadout post-reclamation <br />14-10 & 11 Included Exhibit 60 in discussion <br />14-13 Noted rock check dams in the Coal Canyon channel realignment will <br /> be removed <br />14-14 Added discussion of how cheatgrass infested topsoil stockpiles will be <br />managed <br />CRDA2-12 - 13k Replacement pages (Appendix 13-2) present the revised run-off <br />calculations and design for the CRDA-2 upper diversion ditch <br />14-6-19 - 34 Design of silt fences at reclaimed unit train loadout -Appendix 14-6 <br />Exhibits <br />9C, 18, 11 C, 51, 53, 60 <br />Please let me know if you have any questions. <br />Sincerely, <br />~~ <br />J. E. Stover, P.E. <br />Consulting Engineer <br />