Laserfiche WebLink
CF&I Steel Corporation <br />Dolomite Quarry <br />Permit M-77-376 <br />Revised Reclamation Plan and Timetable <br />January 20, 1987 <br />Reclamation of the Dolomite Quarry will be in conformance with the current <br />plan as to the methods and overall reclamation design. Future active mining <br />will now be limited to the current quarry floor. Reclamation of all inactive <br />areas will begin as soon as possible a~cordin to the re~5gd time_t~ble_bgto~i. <br />~Reclamaiion o~ ac ive~ill be performed when mining ceases. As areas <br />become depleted, they will be reclaimed. <br />Reclamation of all currently inactive areas was started during 1987. Earthwork <br />for the reclamation of the inactive areas will be completed during 1988 and all <br />areas will be seeded during the first planting season thereafter. Monitoring <br />and maintenance of these areas will continue until fully released by the <br />Division. All reclamation will conform to the previously approved plan with <br />respect to slope stabilities, seed bed preparation, soil amendments, and <br />seeding mixtures and rates. Fines material from the active operation will be <br />u~ as a topsoil substitute w er~neecTed. -Configuration and final contours <br />of the inactive areas will be changed to reflect the conditions as they exist <br />today rather than i:hose previously anticipated in the earlier reclamation plan. <br />~Below.is a detailed plan and schedule for reclamation of the inactive areas. <br />Spring 1988 <br />1) Complete slope reduction and establish drainage in Echo Canyon. 2) <br />Evaluate success of grading and revegetation done during 1987 and repair <br />or regrade those areas where erosion is evident and establish drainage <br />channels where necessary. <br />Summer 1988 <br />1) Demolition of structures which would not enhance the post mining land <br />use (grazing) and prepare these areas for revegetation. 2) Reduce berms <br />along roads in inactive areas and prepare them for revegetation. <br />Stabilize outslopes of all roads within the permit area. 3) Pry ewe <br />benches above active quarry for revegetation. <br />Fall 1988 <br />Seed bed preparation, fertilization and seeding of all graded areas <br />including Echo Lanyon, quarry benches, old quarry, shop area, inactive <br />roads and active road outslopes. <br />1989 & Following <br />Reclamation of any inactive areas not previously reclaimed. At the end of <br />this year all inactive areas will be reclaimed, monitoring and maintenance <br />of all areas will continue until the inactive areas are fully released by <br />the Division. <br />