My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REV01957
DRMS
>
Back File Migration
>
Revision
>
REV01957
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 12:59:31 AM
Creation date
11/21/2007 8:56:51 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981019
IBM Index Class Name
Revision
Doc Date
10/30/1997
Doc Name
PROPOSED DECISION FOR APPROVAL OF RN3
Type & Sequence
RN3
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
79
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Findings of the <br />Colorado Division of Minerals and Geology <br />for the <br />COLOWYO COAL MINE <br />EXPLANATION OF FINDINGS <br />Pursuant to Rule 2.07.6(2) of the Regulations of the Colorado Mined Land Reclamation Board <br />for Coal Mining, and the approved state program, the Division of Minerals and Geology or the <br />Boazd must make specific written findings prior to issuance of a permit, permit renewal or permit <br />revision. These findings are based on information made available to the Division that <br />demonstrates that the applicant will be able to operate in compliance with the Colorado Surface <br />Coa] Mining Reclamation Act and the Regulations promulgated pursuant to the Act. The <br />findings in the following sections required by Rule 2.07.6(?) aze listed in accordance with that <br />Rule. The findings and specific approvals required pursuant to Rule 2.07.6(2)(m) aze listed in <br />accordance with Rule 4 and are organized under subject or discipline subtitles. <br />This findings document is updated upon permit renewal, which occurs every five years for the <br />Colowyo Coal Mine (as for most other coal mines in Colorado). This findings reevaluated and <br />updated previous findings, and generated new findings, as necessary to reflect changes which <br />have occurred during the past permit term or are as permitted in the ensuing 5-year term. Any <br />stipulations from the original permit and findings document or subsequent revisions that have <br />been totally resolved, to the satisfaction of the Division, have been removed from this document. <br />SECTION A -Findings Required by Rule 2.07.6(2) <br />I. Accuracy and Completeness. The permit application is accurate and complete, and in <br />compliance with all requirements of the Act and these rules. <br />27 Revised October 30, 1997 <br />
The URL can be used to link to this page
Your browser does not support the video tag.