Laserfiche WebLink
Colowyo Cotrunent Change <br />Section B.XII. <br />Minor Revision Number 25 terminated the Added to the section is: "In 1992, swell <br />requirement to monitor overburden swell factor monitoring and analyses were <br />factors. Permit page 4.14-2 describers our terminated." <br />request to terminate this requirement in the <br />1992 Annual Reclamation Report and the <br />subsequent submittal of the Minor Revision. <br />Section B.XIII.D <br />All references to a vegetative cover standazd All references to a vegetative cover standard <br />applicable to revegetation bond release should applicable to revegetation bond release is <br />refer to "herbaceous cover" rather than "total changed to refer to herbaceous cover rather <br />cover." We suggest that the diversity than total cover. The diversity standard <br />standard discussion in the Findings Document discussion is updated. <br />should also be updated as well. Please refer <br />to Permit page 4.15-20 for a discussion <br />regarding Colowyo's diversity standard. <br />Included in this revision is the approval of Minor Revisions (MR) 45 and 46, processed during <br />the period of August 18, 1997 to the date of this Findings of Compliance. <br />Incidental to posting of the above changes, the following changes were made to the August 18, <br />1997 Proposed Decision and Finding of Compliance: a) A revised Cover Sheet . b) <br />Repagination. c) A revised Table of Contents. d) A revised Paragraph 3.1.1. e) A revised <br />Paragraph 3.1.3. Incidental to reissuance of a Proposed Decision based on the revised Findings <br />of Compliance (October 30, 1997), changes to Pazagraphs 3.18 and 3.19 are incorporated herein. <br />Revised October 30. 1997 <br />