My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REV01889
DRMS
>
Back File Migration
>
Revision
>
REV01889
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 12:59:27 AM
Creation date
11/21/2007 8:56:05 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981019
IBM Index Class Name
Revision
Doc Date
8/25/1993
Doc Name
COLOWYO COAL MINE C-81-019 TR 24
From
DMG
To
JANET BINNS
Type & Sequence
TR24
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
~. <br /> <br />6. The emergency spillway design calculations estimate a discharge volume of 27 cfs. <br />What is this volume based on? <br />7. Drawing 'TR-24" shows the outlet of the wash bay pond spillway intersecting the <br />existing diversion ditch at an angle of roughly 90°. What measures will be taken to <br />ensure that flow from the spillway will not breach the outer bank of the diversion ditch? <br />8. The explanation of facilities reclamation cost estimates includes a summary of <br />structures which will be relocated. The summary states that Unleaded Fuel Tank #7 <br />was relocated to the Stoker facilities area. It does not appear that the costs for the <br />tank ($183.00) have been included in the Stoker facilities reclamation costs. Please <br />have Colowyo verify that these costs have been carried over. <br />9. The same explanation shows relocation of a number of fuel tanks to the southwest <br />facilities area. It does not appear that sludge removal costs ($20,779.20) were carried <br />over. Please have Colowyo verify that these costs were included in the southwest <br />facilities area costs. <br />10. Hourly costs for a Caterpillar D10N operating 1 shift per day should be $160.17. Please <br />have Colowyo base the increase in earthmoving costs on that figure. <br />11. Means structural demolition unit costs should be increased by 2.5% for location <br />adjustment. Please have Colowyo make this adjustment. <br />12. The reclamation cost estimate appears to include a reduction in costs associated with <br />grading and revegetation of the mine maintenance area disturbance. The previously <br />approved reclamation cost amount cannot be decreased unless processed as a release <br />(Rule 3.03). <br />SLB\082593B. WP <br />anet inns 2 August 2 , 1 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.