Laserfiche WebLink
<br /> <br />Technical Revision No. 65 Pege 2 <br />September 27, 1993 <br />2. The coat estimate added for the dozer trap push wall structure ie <br />acceptable to the Division; therefore, no further response ie required. <br />4. Why was the length of the 46^ drop inlet for HB-3 decreased to 15 feet? <br />The Division obtained a length of 66 feet from the Weetar drawings and <br />previously MCC utilized a total length for 48" culverts of 490 feet. <br />6. This le acceptable to the Division. No further response is required. <br />8. It appears that the reclamation coete for the inlet sediment traps are <br />incorrect. For the walla the coat should be $10,806.00 and for the floor, <br />$9,465.00. While this does not make a significant difference in the total <br />job coat, the Division added all the reclamation costa and exceeded MCC'e <br />total coat by $560.00. The total job coat should be reviewed again. <br />MISC~•T~s~OUS PAGE CHANGES <br />1. No further response required. <br />6. No further response required. <br />Please let me know if you have any questions. <br />Sip rely, <br />~~ " <br />Christine E. oh eton <br />Reclamation S c alis <br />007TR65.2 <br />