My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REV01843
DRMS
>
Back File Migration
>
Revision
>
REV01843
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 12:59:24 AM
Creation date
11/21/2007 8:55:46 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1980007
IBM Index Class Name
Revision
Doc Date
9/27/1993
Doc Name
TECHNICAL REVISION 65 WEST ELK MINE FILE CO C-80-007
From
DMG
To
MOUNTAIN COAL CO
Type & Sequence
TR65
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br />III IIIIIIIIIIIIIIII <br />sss <br />STATE OF COLORADO <br />DIVISION OF MINERALS AND GEOLOGY <br />Depanmem of Natural Resources <br />1 J 13 Sherman $1.. Room ? 15 <br />Denver, CO 80207 <br />Phone~130J1866-3567 <br />FAX p03) 8328106 <br />September 27, 1993 <br />Me. Kathleen Welt <br />Mountain Coal Company <br />West Elk Hine <br />P.O. Hox 591 <br />Somerset, CO 81434 <br />RES Technical Revision No. 65; West Elk Mine; File Mo. C-80-007 <br />Dear Ma. Welt; <br />/o~co~ <br />~'~ 4 <br />b <br />0 <br />~ye,,g . <br />~ re )6 <br />Rny Romer <br />Gmernnr <br />Michael tl Lnnp <br />D lv isiwr Uveao~ <br />The Division has reviewed Hountain Coal Company's responses to the Division's <br />adequacy concerns, dated September 24, 1993. The Division has the following <br />concerns which should be resolved prior to issuance of the proposed decision. <br />In regards to the comments supplied by the Division of Water Resources, the <br />Division of Minerals & Geology (DMG) will stipulate that the Division 4 Water <br />Court be notified of the new pond locations within 45 days of DMG's proposed <br />decision. The second part of this stipulation will require that a dam safety <br />review be completed on MB-2 and MB-3 within 45 after construction of the ponds <br />is completed. <br />This letter addressee all previous Division concerns with the exception of the <br />hydrology related concerns, which we are still awaiting. Further Division <br />response regarding the subsurface investigation will be included with the <br />hydrology responses. <br />MISCF.r.T.nrrr•OUS <br />1. The Division believes that drawing G-104 should be included in Exhibit 66. <br />In addition, the Division believes that drawings G-101 and G-102 should be <br />incorporated into the permit. <br />4. If materials are to be stored temporarily on the refuse pile, they should <br />be placed so ae not to preclude reclamation or compaction activities. <br />ROADS <br />1. The changes made to page 2.05-22 are acceptable to the Division. No <br />further response is required. <br />3. The update of Table 47, to include topsoil removed during the ponds and <br />road construction, should be included when MCC addressee Stipulation No. <br />49. <br />4. This is acceptable to the Division. No further response ie required. <br />BOND ESTIMATE <br />1. Unit costa have been adjusted to the satisfaction of the Division; <br />therefore, no further response is required. <br />
The URL can be used to link to this page
Your browser does not support the video tag.