My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REV01792
DRMS
>
Back File Migration
>
Revision
>
REV01792
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 12:59:22 AM
Creation date
11/21/2007 8:55:30 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977301
IBM Index Class Name
Revision
Doc Date
4/20/2000
Doc Name
SALES RECEIPT
From
DMG
To
COLORADO LIEN CO
Type & Sequence
TR3
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Phase IV V Areas G>~ and 7~ wilt be stripped and mined. The topsoil will be removec, stockpiled, <br />preserved and vegetated in Ai'~~, orused immediately in reclamation. The sandstone <br />overburden will be stripped and stockpiled in front of area A or used as backfill in <br />reclamation._ This phase is expected to require ]0 years. The total area worked is <br />expected to be 37-1-§ acres. <br />Phase V Limestone will be removed from the remaining portion of Area lAl while roadways and <br />other pre-74 disturbance is mined and reclaimed. This is expected to require IO year,. <br />The total area worked at this time is expected to be 30 acres. Reclamation w ll continue <br />concurrently with mining through this abase whenever possible as outlined ire Phase Vl. <br />Phase VI Reclamation will be completed during this phase. The sandstone overburden will be <br />pushed back into the excavation left by the limestone leveled and contoured to a slope of <br />less than 2 to l._ The topsoil will be leveled over the sandstone to a depth off" to 12". <br />The area will be seeded with a mixture of Iindian ricegrass, ~Vwheat grass, Mmountain <br />mahogany and l~~abbit brush, to be hand broadcast at 18 Ibs per acre, in the spring. This <br />will be accomplished within 5 years of completion of mining. <br />At some point, if necessary, Area C may be stripped of topsoil which will be stockpiled in Area A., This <br />area will be used for crushing and stockpiling. This will be done, if necessary, in Phase III or later. <br />Because of [he construction of [he Rex-Roberts Road in 1997 (as approved by DMG), it may riot be <br />necessary to use Area C: if that is the case the Area will not be stripped. <br />EKHIBIT D. (REV) MINE PLAN, ROBERTS QUARRY, ^^"!>~^~.APlt.il. 1000, PAGE S OF g l <br />
The URL can be used to link to this page
Your browser does not support the video tag.