My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REV01792
DRMS
>
Back File Migration
>
Revision
>
REV01792
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 12:59:22 AM
Creation date
11/21/2007 8:55:30 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977301
IBM Index Class Name
Revision
Doc Date
4/20/2000
Doc Name
SALES RECEIPT
From
DMG
To
COLORADO LIEN CO
Type & Sequence
TR3
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />MINING PLAN <br />Phase I Area 8, arxd-9 and I O will be stripped, and ftareas 8, 9, 10 and part of 1H1 will be mined <br />(mostly that part of Area l0l which was already stripped prior to 1977). The topsoil <br />from the lower area will be removed first and stockpiled in Area A (Marked TS on some <br />maps). The topsoil will be preserved and vegetated with t~annual rye and Iin~Iian <br />ricegrass. The sandstone over- burden will be drilled and shot. It will then be stripped <br />and piled in front of Area A. Limestone will be removed from areas 8, 9 and ] 0 and W <br />1/4 of area 101. This phase was expected to require 2 years but has lasted fro.n 1977 to <br />1998 and is now expected to last for another year. The total area worked will be <br />approximately ~H43 acres. <br />Phase II Areas ~t and 65 will be stripped and mined. The topsoil will be removed, sto~:kpiled, <br />preserved and vegetated in area A or used immediately in reclamation. The sandstone <br />will be stripped and either piled in front of A or placed in areas which have been mined <br />out as backfill [o facilitate concurrent reclamation. At nresen[ market condi[ionsyq=this <br />phase will last For }5 year~._ The area worked at this time will be <br />approximately ~21G acres. <br />Phase III Areas §1 2 and 43 will be stripped and mined. The topsoil will be removed, stockpiled, <br />preserved and vegetated in area A or used immediately in areas that are bein¢ reclaimed._ <br />The sandstone will be stripped and piled in front of A or used immediatel~~ackfill for <br />reclama[ion._ This phase is expected to lastregccire approximately T~ years at can cnt <br />market conditions. The area worked at this time will be approximately X81 ~ acres. fcrea <br />'- `" ',~,~-~ar--° ~'°'--.;~Concurrent reclamation will continue durine this uhase. The <br />sandstone overburden will be backfilled into the excavation left by extraction of the <br />limestone, leveled and contoured. The topsoil from area A will be spread over the <br />sandstone at a depth of 6" to 12". Seeding will be done with a mixture of Indian ricegrass <br />and Annual rye. <br />EXHIBIT D. (REV) MINE PLAN, ROBERTS QUARRY, ^~ ^.~T' 'rA°o`APRIl. '000, PAGE 2 OF 3•I <br />
The URL can be used to link to this page
Your browser does not support the video tag.