Laserfiche WebLink
CIRCES Cost Estimating Software <br />PROJECT IDENTIFICATION <br />Task # : 011 <br />Date : 08/19/2002 <br />User: JRS <br />Agency or organization name :Colorado Division Of Minerals And <br />Permit or other job action :Permit Renewal 04 <br />Task description :Replace Topsoil from Stoc <br />HOURLY EQUIPMENT COST <br />Permiujob# : C-81-033 <br />Abbreviation :none <br />Filename :C033-011 <br />to Facilities Area <br />Basic machine :Caf D8R - 8SU <br />Blade type :Semi-Universal <br />Attachment no. 1 : ROPS Cab <br />Attachment no. 2 :3-shank ripper <br />Cost Breakdown <br />State :Colorado <br />County :Gunnison <br />Site :Bear No. 3 Mine <br /> Utilization <br />OwnershipcosUhour : $48.47 NA <br />Operating cosUhour : $58.82 100 <br />Ripper op. cost/hour : $0.00 0 <br />Operator cosUhour : $30.65 NA <br />Total unit cosUhour : $137.94 Total fleet cosUhour <br />'.94 <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />volume : 5,000 CCY factor : 1.125 volume : 5,625 LCY <br /> <br />Source of estimated volume :Volume 1, page 2.05-23R <br />Source of estimated swell factor :CAT Handbook <br />HOURLY PRODUCTION ~ Job Condition Correction Factors ~~~ Source <br /> Operator skill : 0.75 (avg.) <br />Average push distance : 300 feet Material consistency : 1.00 (Cat HB) <br />Unadjusted hourly production : 291.4 LCY/hr Dozing method : 1.00 (gen.) <br /> Visibility : 7.00 (avg.) <br />Material consistency description : Job efficiency : 0.83 (lshifUday) <br />Consolidated stockpile Spoil pile ; 0.80 (fnd-r~ <br /> Push gradient ; 1.00 (Caf HB) <br />Average push gradient : 0.00 % (post Altitude : 1.00 (Cat HB) <br />Average site altitude : 6,000 feet Material weight ; _ 0.90 i (Cat HB) <br /> Blade type : 1.00 (S/SU/U) <br />Material weigh! : 2,550 Ibs/LCY Net correction : 0.45 <br />Weight description <br />EaRh -Dry packed Adjusted unit production : 130.89 LCY/hr <br /> Adjusted flee[ production : 130.84 LCY/hr <br />JOB TIME AND COST - ~~~ -~ <br />Fleet size : 1 Dozers) Total job time : 42.99 Hours <br />Unit cost : $1.054 /LCY Total job cost : $5, 930 <br />Horsepower: 305 <br />Shift basis : 1 per day <br />Data source : (CRG) <br />