My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REV01702
DRMS
>
Back File Migration
>
Revision
>
REV01702
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 12:59:16 AM
Creation date
11/21/2007 8:54:42 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981033
IBM Index Class Name
Revision
Doc Date
8/19/2002
Doc Name
Adequacy Letter
From
DMG
To
Bear Coal Company
Type & Sequence
RN4
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CIRCES Cost Estimatin Software <br />PROJECT IDENTIFICATION <br /> State :Colorado PermiUjob# : C-81-033 <br />Task # : 009 <br /> Gunnison Abbreviation :none <br />t <br />Date: 08/19/2002 y: <br />Coun <br /> 3 Mine <br />ar No <br />Sit <br />B Filename : C033-009 <br />User : JRS . <br />e : <br />e <br />or organization name <br />enc <br />A :Colorado Division Of Minerals And Geology <br />y <br />g <br />Permit or other job action :Permit Renewal 04 <br />Task description : Regrade Sediment Pond <br />HOURLY EQUIPMENT COST 305 <br /> Basic machine :Cat D8R - 8SU Horsepower : <br /> Blade type :Semi-Universal <br /> Attachment no. 1 : ROPS Cab Shift basis : 1 per day <br /> Attachment no. 2 :3-shank ripper <br /> Data source : (CRG) <br /> Utilization <br />Cost Brea own • Ownership cosUhour : $48.47 NA <br /> Operating cost/hour : $58.82 100 <br /> Ripper op. cosUhour : $0.00 0 <br /> Operator cosUhour: $30.65 N7+ <br /> Total unit cost/hour : $137.94 Total Fleet cosUhour : $137.94 <br />HOURLY PRODUCTION <br />Average push distance : 60 feet <br />Unadjusted hourly production : 1,246.9 LCY/hr <br />Material consistency description <br />C:mm~antad fill or embankment <br />Average push gradient : 0.00 % (I <br />Average site altitude : 6,000 feet <br />Material weight : 2,550 Ibs/LCY <br />Weight description <br />Earth -Dry packed <br />Adjusted unit production <br />Adjusted fleet production <br />JOB TIME AND COST <br />Fleet size : 1 Dozers) Total job time <br />Unit cost : $0.274 /LCY Total job cost <br />Job Condition Correction Factors <br />Operator skill :` <br />Material consistency <br />Dozing method :~_ <br />Visibility <br />Job efficiency :_ <br />Spoil pile <br />Push gradient ^_ <br />Altitude :_ <br />Material weight <br />Blade type <br />Net correction <br />0.75 <br />0.90 <br />1.00 <br />1.00 <br />0.83 <br />0.80 <br />1.00 <br />1.00 <br />0.90 <br />1.00 <br />0.40 <br />_... <br />Source <br />
The URL can be used to link to this page
Your browser does not support the video tag.